Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-51448Bost Farm
16N-8A-L
PDC ENERGY INC
69175
PR
11/23/2022
WATTENBERG
90750
GREELEY/WELD  123
Lot2 7 5N66W 6
456832
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1700 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404400454Form 1710/14/202510/22/2025PLUNGER LIFT62DOWN TO 0 WATER H200 CONTINUOUS 465432No----Remediation follow up test. 62 PSI gas and water, blew down to 0 within first few seconds, water continued for entire test. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy.
403973664Form 1710/28/202410/29/2024PLUNGER LIFT54DOWN TO 0 WATER H200 CONTINUOUS 597599No----Remediation follow up test. 54 PSI gas and water flow blew down to 0 PSI within first few seconds of test. Water continued to trickle for the remainder of the test, ~1/2 gallon total fluid. PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull11/1/202311/13/2023Flowing23Down to Zero--0No Flow808803NoNoNoAnnual Test. 23 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
403250023Form 1712/1/202212/5/2022FLOWING166DOWN TO 0 WATER H200 CONTINUOUS 26292628Yes--Yes30 days of first sales - high pressure follow-up. 166 PSI water and gas flow blew down to 0 PSI within 5 minutes. Water on open, produced ~1/2 gallon and died to drip, 1 gallon total. PDC collected 1000mL water sample and will and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy.
403076348Form 176/10/20226/13/2022SHUT-IN0NO FLOW --0 NO FLOW 00No----Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy.