Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-51447Bost Farm
39N-8B-L
PDC ENERGY INC
69175
PR
11/21/2022
WATTENBERG
90750
GREELEY/WELD  123
Lot2 7 5N66W 6
456832
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1700 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404399680Form 1710/10/202510/21/2025PLUNGER LIFT66DOWN TO 0 WATER H200 CONTINUOUS 421419No----Remediation follow up test. 66 PSI gas and water, blew down to 0 within first few seconds, water continued for entire test. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy.
404043754Form 1712/11/202412/31/2024PLUNGER LIFT12DOWN TO 0 GAS0 NO FLOW 545546No----Remediation follow up test. 12 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull10/15/202410/22/2024 15Continuous--0No Flow581580NoNoNoAnnual Test.  15 PSI blew down to 0 PSI within first few seconds of test.  No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull11/14/202311/22/2023Flowing13Down to Zero--0No Flow771771NoNoNoAnnual Test. 13 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
403250057Form 1712/1/202212/5/2022FLOWING229DOWN TO 0 MUD0 CONTINUOUS 26182616Yes--Yes30 days of first sales - high pressure follow-up. 229 PSI mud and gas flow blew down to 0 PSI within 5 minutes. Mud on open, produced ~1.5 gallons and died to drip, 2 gallons total. PDC collected 40mL sample and will submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy.
403076360Form 176/10/20226/13/2022SHUT-IN0NO FLOW --0 NO FLOW 00No----Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy.