Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-51446Bost Farm
9N-8C-L
PDC ENERGY INC
69175
PR
12/1/2022
WATTENBERG
90750
GREELEY/WELD  123
Lot2 7 5N66W 6
456832
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1659 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404409304Form 1710/16/202510/27/2025PLUNGER LIFT18DOWN TO 0 GAS0 NO FLOW 465469No----Remediation follow up test. 18 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy.
403976584Form 1710/28/202410/30/2024PLUNGER LIFT8DOWN TO 0 GAS0 NO FLOW 429428No----Remediation follow up test. 8 PSI gas flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
403799376Form 175/16/20245/21/2024FLOWING26DOWN TO 0 WATER H200 CONTINUOUS 488486No----Annual test. 26 PSI gas flow blew down to 0 PSI in seconds, water started to drip at 15 minute mark and continued for remainder of test, ~1/2 quart total. Fluid quantity insufficient to collect sample. PDC will monitor pressure and re-test according to bradenhead policy.
403291182Form 171/11/20231/16/2023FLOWING58DOWN TO 0 WATER H200 CONTINUOUS 17301730Yes----Automation Alert follow-up. 58 PSI, gas on open for less than 1 second. Water drip/trickle started at 10 minute mark for remainder of test producing ~750mL of water total. Displaced after test and collected water sample.
403265333Form 1712/16/202212/19/2022FLOWING2DOWN TO 0 GAS0 NO FLOW 21862185No----Post-Production within 60 days of first sales. 2 PSI blew down to 0 PSI within first minute of test, no pressure or flow observed for the remainder of the test.
403076381Form 176/10/20226/13/2022SHUT-IN0NO FLOW --0 NO FLOW 00No----Initial Test Post Rig Release. 0 PSI, no pressure or flow observed for the entire 30 min test. PDC will monitor pressure and re-test according to bradenhead policy.