| 404380913 | Form 17 | 9/30/2025 | 10/6/2025 | GAS LIFT | 1 | DOWN TO 0 | -- | 1 | NO FLOW | 487 | 491 | No | -- | -- | |
| 403945394 | Form 17 | 9/25/2024 | 10/3/2024 | FLOWING | 0 | NO FLOW | -- | 0 | NO FLOW | 828 | 828 | No | -- | -- | |
| 403605234 | Form 17 | 11/21/2023 | 11/22/2023 | FLOWING | 0 | NO FLOW | -- | 0 | NO FLOW | 1006 | 1019 | No | -- | -- | |
| 403160007 | Form 17 | 9/8/2022 | 9/8/2022 | FLOWING | 2 | DOWN TO 0 | -- | 0 | NO FLOW | 2323 | 2323 | No | -- | -- | |
| 402989786 | Form 17 | 3/16/2022 | 3/21/2022 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 0 | 0 | No | -- | -- | Pre-frac bradenhead test. Production casing open while installing Lower Master. Prod. csg 0psi, sfc casing 0psi. No pressure built, no flow observed. |