403945259 | Form 17 | 9/25/2024 | 10/3/2024 | GAS LIFT | 0 | NO FLOW | -- | 0 | NO FLOW | 580 | 581 | No | -- | -- | |
403605210 | Form 17 | 11/21/2023 | 11/22/2023 | FLOWING | 0 | NO FLOW | -- | 0 | NO FLOW | 991 | 1012 | No | -- | -- | |
403159744 | Form 17 | 9/8/2022 | 9/8/2022 | FLOWING | 0 | NO FLOW | -- | 0 | NO FLOW | 2179 | 2179 | No | -- | -- | |
402989722 | Form 17 | 3/16/2022 | 3/21/2022 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 0 | 0 | No | -- | -- | Pre-frac bradenhead test, production casing open while lower master installed. Production casing pressure 0 psi, Surface casing pressure 0 psi. No flow observed, no pressure built. |