403995497 | Form 17 | 11/12/2024 | 11/14/2024 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 4 | 4 | No | -- | -- | |
403601559 | Form 17 | 11/10/2023 | 11/20/2023 | GAS LIFT | 0 | NO FLOW | -- | 0 | NO FLOW | 661 | 664 | No | -- | -- | |
403210434 | Form 17 | 10/18/2022 | 10/27/2022 | GAS LIFT | 10 | DOWN TO 0 | -- | 0 | NO FLOW | 616 | 633 | No | -- | -- | |
402910765 | Form 17 | 12/28/2021 | 12/28/2021 | FLOWING | 0 | NO FLOW | -- | 0 | NO FLOW | 38 | 38 | No | -- | -- | |
402791771 | Form 17 | 8/18/2021 | 8/25/2021 | SHUT-IN | 15 | DOWN TO 0 | VAPOR | 0 | NO FLOW | 0 | 0 | No | -- | -- | Bradenhead test prior to toe prep ops. Production casing 0 psi (Nippled Up lower master, casing static during installation). Surface casing 15 psi blew down instantly. No further flow observed, no pressure built. |