403995596 | Form 17 | 11/12/2024 | 11/14/2024 | SHUT-IN | 1 | DOWN TO 0 | GAS | 0 | NO FLOW | 626 | 626 | No | -- | -- | |
403601603 | Form 17 | 11/10/2023 | 11/20/2023 | GAS LIFT | 0 | NO FLOW | -- | 0 | NO FLOW | 556 | 552 | No | -- | -- | |
403210449 | Form 17 | 10/18/2022 | 10/27/2022 | GAS LIFT | 15 | DOWN TO 0 | -- | 0 | NO FLOW | 677 | 676 | No | -- | -- | |
402910806 | Form 17 | 12/28/2021 | 12/28/2021 | FLOWING | 0 | NO FLOW | -- | 0 | NO FLOW | 168 | 168 | No | -- | -- | |
402791980 | Form 17 | 8/18/2021 | 8/25/2021 | SHUT-IN | 10 | DOWN TO 0 | NONE | 0 | NO FLOW | 0 | 0 | No | -- | -- | Bradenhead test prior to toe prep ops. Production casing 0 psi (Nippled Up lower master, casing static during installation). Surface casing 10 psi blew down instantly. No further flow observed, no pressure built. |