403998087 | Form 17 | 11/12/2024 | 11/18/2024 | GAS LIFT | 0 | NO FLOW | -- | 0 | NO FLOW | 493 | 492 | No | -- | -- | |
403596356 | Form 17 | 11/8/2023 | 11/15/2023 | PLUNGER LIFT | 0 | NO FLOW | -- | 0 | NO FLOW | 395 | 393 | No | -- | -- | |
403245185 | Form 17 | 11/21/2022 | 11/30/2022 | GAS LIFT | 1 | DOWN TO 0 | -- | 0 | NO FLOW | 447 | 447 | No | -- | -- | |
402736663 | Form 17 | 7/1/2021 | 7/1/2021 | FLOWING | 0 | DOWN TO 0 | -- | 0 | NO FLOW | 1626 | 1626 | No | -- | -- | |
402581959 | Form 17 | 1/19/2021 | 1/25/2021 | SHUT-IN | 0 | DOWN TO 0 | NONE | 0 | NO FLOW | 0 | 0 | No | -- | -- | Well static and shut-in prior to stimulation. Prod csg @ 0 psi, sfc csg @ 0 psi. Faint hiss when opening bradenhead, bled to zero in 2-3 seconds. No flow observed, no pressure built. |
402387323 | Form 17 | 5/1/2020 | 5/1/2020 | SHUT-IN | 0 | DOWN TO 0 | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | BPV installed in top of production csg and 10k cap installed. Well cased and cemented but not perforated. Prod. csg press assumed 0 psi. Original sfc csg pressure found to be 0 psi. Opened gate valve to blow down, observed no flow and built no pressure. |