Click for Specifics | Light | 4/21/2024 | 7/29/2024 | | 10 | | -- | 0 | | 456 | 456 | No | No | No | |
Click for Specifics | Light | 4/10/2023 | 5/15/2023 | Plunger Lift | 32 | | -- | 0 | | 620 | 619 | No | No | No | |
Click for Specifics | Light | 4/11/2022 | 5/16/2022 | Plunger Lift | 34 | | -- | 0 | | 467 | 466 | No | No | No | |
402688134 | Form 17 | 5/11/2021 | 5/18/2021 | FLOWING | 15 | DOWN TO 0 | GAS | 0 | NO FLOW | 505 | 504 | No | -- | -- | This integrity test was done at the request of the COGCC due to the 3 string wellbore designs |
402402031 | Form 17 | 5/18/2020 | 5/19/2020 | FLOWING | 21 | DOWN TO 0 | -- | 0 | NO FLOW | 2 | 2 | No | -- | -- | |
402316016 | Form 17 | 2/7/2020 | 2/18/2020 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | |