| 404413093 | Form 17 | 10/20/2025 | 10/28/2025 | PLUNGER LIFT | 246 | DOWN TO 0 | WATER H20 | 0 | CONTINUOUS | 395 | 395 | No | -- | -- | Remediation follow up test. 246 PSI gas and water, blew down to 0 within first few seconds, water continued for entire test. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403973254 | Form 17 | 10/28/2024 | 10/29/2024 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 133 | 133 | No | -- | -- | Remediation follow up test. 0 PSI, no pressure or flow observed. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403527176 | Form 17 | 9/7/2023 | 9/12/2023 | PLUNGER LIFT | 24 | CONTINUOUS | WATER H20 | 0 | NO FLOW | 477 | 475 | No | -- | -- | Abatement system follow up test. 24 PSI water and gas flow blew down to 0 PSI within first minute of test. Black fluid dripped for 20 minutes. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. |
| 403264421 | Form 17 | 12/16/2022 | 12/19/2022 | PLUNGER LIFT | 91 | DOWN TO 0 | GAS AND LIQUID HYDROCARBON | 0 | NO FLOW | 576 | 583 | Yes | -- | -- | Automation Alert follow-up test. 91 PSI gas and fluid blew down to 0 PSI within first 5 minutes of test. 1 gallon of fluid the first 2 minutes, then steady drip for next minute of test. No pressure or flow observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 1/28/2022 | 2/21/2022 | | 6 | Down to Zero | -- | 0 | Down to Zero | 662 | 703 | No | No | No | |
| Click for Specifics | Full | 8/17/2021 | 11/1/2021 | | 0 | No Flow | -- | 0 | No Flow | 944 | 973 | No | None | None | |
| 402518219 | Form 17 | 10/16/2020 | 10/26/2020 | FLOWING | 7 | DOWN TO 0 | -- | 0 | NO FLOW | 1539 | 1539 | No | -- | -- | Post production test 7 PSI blew down to 0 PSI within seconds, no pressure or flow observed for the remainder of the test. |
| 402930480 | Form 17 | 10/6/2020 | 1/19/2022 | FLOWING | 7 | DOWN TO 0 | -- | 0 | NO FLOW | 1539 | 1539 | No | -- | -- | Post Production within 60 days of first sales, 7 PSI blew down to 0 PSI within first minute of test, no pressure or flow observed for the remainder of the test. PDC will monitor bradenhead pressure monthly and submit annual test. (Submitted as part of PDC's ongoing Bradenhead Clean-Up) |
| 402237987 | Form 17 | 11/8/2019 | 11/13/2019 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | No fluid, vapor or gas. |