| 404413175 | Form 17 | 10/20/2025 | 10/28/2025 | PLUNGER LIFT | 112 | DOWN TO 0 | WATER H20 | 0 | CONTINUOUS | 420 | 419 | No | -- | -- | Remediation follow up test. 112 PSI gas and water, blew down to 0 within first few seconds, water continued for entire test. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403973292 | Form 17 | 10/28/2024 | 10/29/2024 | PLUNGER LIFT | 0 | NO FLOW | -- | 0 | NO FLOW | 574 | 619 | No | -- | -- | Remediation follow up test. 0 PSI, no pressure or flow observed. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 12/20/2023 | 12/26/2023 | Shut In | 3 | Down to Zero | -- | 0 | Down to Zero | 595 | 595 | No | No | No | Annual Test. 3 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403231032 | Form 17 | 11/15/2022 | 11/16/2022 | SHUT-IN | 2 | DOWN TO 0 | GAS | 0 | NO FLOW | 716 | 717 | No | -- | -- | Abatement system follow up test. 2 PSI whisper blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. |
| 403044973 | Form 17 | 5/10/2022 | 5/11/2022 | FLOWING | 95 | CONTINUOUS | WATER AND LIQUID HYDROCARBON | 0 | CONTINUOUS | 851 | 851 | Yes | -- | -- | Engineering Ad Hoc test, 95 PSI gas and water blew down to 0 PSI in thirty minutes. Steady drip of fluid through out test. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly. |
| 403004194 | Form 17 | 4/4/2022 | 4/5/2022 | FLOWING | 99 | DOWN TO 0 | -- | 0 | NO FLOW | 891 | 819 | Yes | -- | -- | Engineering Ad Hoc test, 99 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will continue to monitor monthly. |
| 402998883 | Form 17 | 3/28/2022 | 3/30/2022 | FLOWING | 96 | DOWN TO 0 | -- | 0 | NO FLOW | 898 | 898 | Yes | -- | -- | Engineering Ad Hoc test, 96 PSI blew down to 0 PSI within 5 minutes with no flow or pressure for the remainder of the test. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 1/28/2022 | 2/21/2022 | | 34 | Down to Zero | -- | 0 | Down to Zero | 936 | 937 | No | No | No | |
| Click for Specifics | Full | 8/9/2021 | 11/1/2021 | | 19.11 | Down to Zero | -- | 0 | Down to Zero | 986 | 986 | No | None | None | |
| 402930459 | Form 17 | 10/6/2020 | 1/19/2022 | FLOWING | 6 | DOWN TO 0 | -- | 0 | NO FLOW | 1456 | 1456 | No | -- | -- | Post Production within 60 days of first sales, 6 PSI blew down to 0 PSI within first minute of test, no pressure or flow observed for the remainder of the test. PDC will monitor bradenhead pressure monthly and submit annual test. (Submitted as part of PDC's ongoing Bradenhead Clean-Up) |
| Click for Specifics | Light | 4/16/2020 | 12/14/2020 | | 0 | | -- | 0 | | 203 | 203 | No | No | No | |
| 402238448 | Form 17 | 11/8/2019 | 11/13/2019 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | No fluid, vapor, or gas. |
| 402237947 | Form 17 | 11/8/2019 | 11/13/2019 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | No fluid, vapors or gas. |