WELL05-123-50257Bost Farm
34C-11-L
PDC ENERGY INC
69175
PR
5/1/2020
DJ HORIZONTAL CODELL
16948
GREELEY/WELD  123
NWSW 7 5N66W 6
456832
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1824 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404413175Form 1710/20/202510/28/2025PLUNGER LIFT112DOWN TO 0 WATER H200 CONTINUOUS 420419No----Remediation follow up test. 112 PSI gas and water, blew down to 0 within first few seconds, water continued for entire test. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy.
403973292Form 1710/28/202410/29/2024PLUNGER LIFT0NO FLOW --0 NO FLOW 574619No----Remediation follow up test. 0 PSI, no pressure or flow observed. PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull12/20/202312/26/2023Shut In3Down to Zero--0Down to Zero595595NoNoNoAnnual Test. 3 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
403231032Form 1711/15/202211/16/2022SHUT-IN2DOWN TO 0 GAS0 NO FLOW 716717No----Abatement system follow up test. 2 PSI whisper blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly.
403044973Form 175/10/20225/11/2022FLOWING95CONTINUOUS WATER AND LIQUID HYDROCARBON0 CONTINUOUS 851851Yes----Engineering Ad Hoc test, 95 PSI gas and water blew down to 0 PSI in thirty minutes. Steady drip of fluid through out test. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly.
403004194Form 174/4/20224/5/2022FLOWING99DOWN TO 0 --0 NO FLOW 891819Yes----Engineering Ad Hoc test, 99 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will continue to monitor monthly.
402998883Form 173/28/20223/30/2022FLOWING96DOWN TO 0 --0 NO FLOW 898898Yes----Engineering Ad Hoc test, 96 PSI blew down to 0 PSI within 5 minutes with no flow or pressure for the remainder of the test. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly.
Click for SpecificsFull1/28/20222/21/2022 34Down to Zero--0Down to Zero936937NoNoNo 
Click for SpecificsFull8/9/202111/1/2021 19.11Down to Zero--0Down to Zero986986NoNoneNone 
402930459Form 1710/6/20201/19/2022FLOWING6DOWN TO 0 --0 NO FLOW 14561456No----Post Production within 60 days of first sales, 6 PSI blew down to 0 PSI within first minute of test, no pressure or flow observed for the remainder of the test. PDC will monitor bradenhead pressure monthly and submit annual test. (Submitted as part of PDC's ongoing Bradenhead Clean-Up)
Click for SpecificsLight4/16/202012/14/2020 0 --0 203203NoNoNo 
402238448Form 1711/8/201911/13/2019SHUT-IN0NO FLOW --0 NO FLOW 00No----No fluid, vapor, or gas.
402237947Form 1711/8/201911/13/2019SHUT-IN0NO FLOW --0 NO FLOW 00No----No fluid, vapors or gas.