| 404576384 | Form 17 | 3/6/2026 | 3/11/2026 | PLUNGER LIFT | 22 | DOWN TO 0 | GAS | 0 | NO FLOW | 314 | 314 | No | -- | -- | |
| Click for Specifics | Full | 10/20/2025 | 10/27/2025 | | 21 | Down to Zero | -- | 0 | No Flow | 378 | 383 | No | No | No | Annual Test. 21 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404141881 | Form 17 | 3/13/2025 | 3/26/2025 | PLUNGER LIFT | 55 | DOWN TO 0 | WATER H20 | 0 | CONTINUOUS | 522 | 533 | No | -- | -- | Remediation follow up test. 55 PSI blew down to 0 PSI within first few seconds. Water observed for entire test, ~1/4 gal. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403885201 | Form 17 | 8/7/2024 | 8/11/2024 | | 61 | CONTINUOUS | WATER AND GAS | 0 | WHISPER | 485 | 492 | No | -- | -- | Annual test. 61 PSI water and gas flow blew down to 0 PSI within thirty minutes, whisper gad and water continued to trickle for entire test. Insufficient fluid to sample. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 12/13/2023 | 12/18/2023 | Plunger Lift | 3 | Down to Zero | -- | 0 | Down to Zero | 68 | 686 | No | No | No | Annual Test. 3 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 1/28/2022 | 2/21/2022 | | 6 | Down to Zero | -- | 0 | Down to Zero | 911 | 912 | No | No | No | |
| Click for Specifics | Full | 8/17/2021 | 11/1/2021 | | 6 | Down to Zero | -- | 0 | No Flow | 1085 | 1085 | No | None | None | |
| 402930533 | Form 17 | 10/6/2020 | 1/19/2022 | FLOWING | 8 | DOWN TO 0 | -- | 0 | NO FLOW | 1511 | 1511 | No | -- | -- | Post Production within 60 days of first sales, 8 PSI blew down to 0 PSI within first minute of test, no pressure or flow observed for the remainder of the test. PDC will monitor bradenhead pressure monthly and submit annual test. (Submitted as part of PDC's ongoing Bradenhead Clean-Up) |
| Click for Specifics | Light | 4/23/2020 | 12/14/2020 | | 38 | | -- | 0 | | 260 | 260 | No | No | No | |
| 402238042 | Form 17 | 11/8/2019 | 11/13/2019 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | No fluid, vapor or gas. |