Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-50253Bost Farm
33N-11A-L
PDC ENERGY INC
69175
PR
11/1/2023
DJ HORIZONTAL NIOBRARA
16950
GREELEY/WELD  123
NWSW 7 5N66W 6
456832
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1799 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404413166Form 1710/20/202510/28/2025PLUNGER LIFT24DOWN TO 0 WATER H200 NO FLOW 369369No----Remediation follow up test. 24 PSI water, blew down to 0 within first few seconds. No pressure or flow observed for the remainder of test. Operator will monitor pressure and re-test according to bradenhead policy.
403973283Form 1710/28/202410/29/2024PLUNGER LIFT11DOWN TO 0 WATER H200 CONTINUOUS 411395No----Remediation follow up test. 11 PSI water and gas flow blew down to 0 PSI within first minute of test. Water continued to drip for the remainder of the test, ~1 quart total fluid. PDC will monitor pressure and re-test according to bradenhead policy.
403846735Form 177/5/20247/8/2024FLOWING13WHISPER WATER AND GAS0 WHISPER 346346No----Annual test. 13 PSI water drip and whisper gas flow blew down to 0 PSI in 30 minutes. Fluid quantity insufficient to sample. PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull12/20/202312/26/2023Shut In0Down to Zero--0Down to Zero499499NoNoNoAnnual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy.
403158945Form 179/7/20229/8/2022FLOWING70DOWN TO 0 GAS0 NO FLOW 528529Yes----Engineering Ad Hoc test. 70 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly.
Click for SpecificsFull1/28/20222/21/2022 5Down to Zero--0Down to Zero706726NoNoNo 
Click for SpecificsFull8/17/202111/1/2021 0No Flow--0No Flow962960NoNoneNone 
402930431Form 1710/6/20201/19/2022FLOWING4DOWN TO 0 --0 NO FLOW 16101610No----Post Production within 60 days of first sales, 4 PSI blew down to 0 PSI within first minute of test, no pressure or flow observed for the remainder of the test. PDC will monitor bradenhead pressure monthly and submit annual test. (Submitted as part of PDC's ongoing Bradenhead Clean-Up)
Click for SpecificsLight4/16/202012/14/2020 32 --0 484484NoNoNo 
402238033Form 1711/8/201911/13/2019SHUT-IN0NO FLOW --0 NO FLOW 00No----No fluid, vapor or gas.