Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-50251Bost Farm
12N-11C-L
PDC ENERGY INC
69175
PR
6/13/2020
DJ HORIZONTAL NIOBRARA
16950
GREELEY/WELD  123
NWSW 7 5N66W 6
456832
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1800 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404413115Form 1710/20/202510/28/2025PLUNGER LIFT56CONTINUOUS WATER H200 NO FLOW 308314No----Remediation follow up test. 56 PSI water, blew down to 0 within ten minutes of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy.
403973264Form 1710/28/202410/29/2024PLUNGER LIFT74DOWN TO 0 WATER H200 CONTINUOUS 349346No----Remediation follow up test. 74 PSI gas and water flow blew down to 0 PSI within first minute of test. Water continued to trickle for the remainder of the test, ~0.5 gallons. PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull12/20/202312/26/2023Shut In0Down to Zero--0Down to Zero547547NoNoNoAnnual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy.
403231018Form 1711/15/202211/16/2022SHUT-IN3DOWN TO 0 GAS0 NO FLOW 624624No----Abatement system follow up test. 3 PSI whisper blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly.
403024362Form 174/21/20224/22/2022FLOWING87DOWN TO 0 --0 NO FLOW 683603Yes----Engineering Ad Hoc test, 87 PSI blew down to 0 PSI within 5 minutes with no flow or pressure for the remainder of the test. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly.
Click for SpecificsFull1/28/20222/21/2022 19Down to Zero--0Down to Zero682682NoNoNo 
Click for SpecificsFull8/17/202111/1/2021 15Down to Zero--0No Flow891891NoNoneNone 
Click for SpecificsLight12/3/202012/14/2020 0 --0 550550NoNoNo 
402930544Form 1710/6/20201/19/2022FLOWING3DOWN TO 0 --0 NO FLOW 15251525No----Post Production within 60 days of first sales, 3 PSI blew down to 0 PSI within first minute of test, no pressure or flow observed for the remainder of the test. PDC will monitor bradenhead pressure monthly and submit annual test. (Submitted as part of PDC's ongoing Bradenhead Clean-Up)
402237973Form 1711/8/201911/13/2019SHUT-IN0NO FLOW --0 NO FLOW 00No----No fluid, vapor or gas.