Click for Specifics | Light | 6/11/2024 | 7/23/2024 | | 3 | | -- | 0 | | 705 | 705 | No | No | No | |
Click for Specifics | Light | 4/10/2023 | 5/15/2023 | Plunger Lift | 15 | | -- | 0 | | 822 | 822 | No | No | No | |
Click for Specifics | Light | 4/7/2022 | 5/16/2022 | Plunger Lift | 5 | | -- | 0 | | 819 | 819 | No | No | No | |
402687888 | Form 17 | 5/11/2021 | 5/18/2021 | FLOWING | 25 | DOWN TO 0 | GAS | 0 | NO FLOW | 772 | 772 | No | -- | -- | This integrity test was done at the request of the COGCC due to the 3 string wellbore designs. |
402442662 | Form 17 | 7/13/2020 | 7/14/2020 | FLOWING | 23 | DOWN TO 0 | -- | 0 | NO FLOW | 879 | 901 | No | -- | -- | |
402326514 | Form 17 | 2/26/2020 | 2/27/2020 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | |