Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-48933Guttersen
C28-725
NOBLE ENERGY INC
100322
PR
5/24/2024
WATTENBERG
90750
WELD  123
SWSE 33 4N64W 6
459542
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1927 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404290361Form 177/22/20257/23/2025 0NO FLOW NONE0 NO FLOW 629615No----NO PRESSURE ON SURFACE CASING.
403885169Form 178/6/20248/11/2024 0NO FLOW NONE0 NO FLOW 14331434No----NO PRESSURE ON SURFACE CASING. NO SURFCE KIT ATTACHED TO WELL.
403848860Form 177/8/20247/9/2024 32CONTINUOUS GAS0 NO FLOW 18951895No----GAS PRESENT AT BEGINNING OF TEST. GAS WAS NOT CONTINUOUS. BLEW DOWN TO ZERO. NO PSI NO FLOW AT END OF TEST.
403702060Form 172/26/20242/28/2024 16CONTINUOUS GAS0 NO FLOW 00No----GAS PRESENT AT BEGINNING OF TEST. GAS WAS NOT CONTINUOUS. BLEW DONWTO ZERO. NO PSI NO FLOW AT END OF TEST. SURFACE KIT HAS BEEN REMOVED FOR 1,416 HOURS PRIOR TO TEST.
403507729Form 178/21/20238/24/2023 178CONTINUOUS GAS0 WHISPER 00YesYes--GAS PRESENT AT BEGINNING OF TEST. GAS WAS NOT CONTINUOUS. BLEW DOWN TO ZERO, NO PSI, NO FLOW AT END OF TEST. SURFACE CASING GAS SAMPLE COLLECTED ONLY. NO PRESSURE IN PRODUCTION CASING. UNABLE TO COLLECT TUBING PRESSURE.
403452542Form 176/28/20237/3/2023 58CONTINUOUS GAS1 CONTINUOUS 00No----GAS PRESENT AT BEGINING OF TEST. GAS WAS CONTINUOUS. DID NOT BLOW DOWN TO ZERO. 1 PSI, FLOW AT THE END OF TEST. NO SAMPLE COLLECTED BECAUSE THER WAS NO PRODUCTION CASING.
403298650Form 171/20/20231/23/2023 411CONTINUOUS GAS3 WHISPER 00No----BLEWDOWN TO 2 PSI. SI PSI 3
403266528Form 1712/18/202212/20/2022 0NO FLOW NONE220 NO FLOW 00No----SURFACE CASING HAS 410 PSI AFTER 30 MINUTE TEST. SURFACE CASING BLOWN DOWN BEFORE TEST TO INSTALL A NEW GUAGE. COGCC ENGINEER NOTIFIED OF HIGH PRESSURES