Click for Specifics | Light | 10/24/2024 | 10/28/2024 | | 5 | | -- | 0 | | 280 | 282 | No | No | No | |
Click for Specifics | Light | 8/22/2023 | 9/25/2023 | Plunger Lift | 12 | | -- | 0 | | 305 | 297 | No | No | No | |
403133758 | Form 17 | 8/8/2022 | 8/12/2022 | FLOWING | 10 | DOWN TO 0 | GAS | 0 | NO FLOW | 360 | 360 | No | -- | -- | Mitigation Bradenhead Test
WBD attached |
Click for Specifics | Light | 4/14/2022 | 5/16/2022 | Flowing | 5 | | -- | 0 | | 337 | 349 | No | No | No | |
402748305 | Form 17 | 7/9/2021 | 7/16/2021 | FLOWING | 0 | NO FLOW | NONE | 0 | NO FLOW | 521 | 507 | No | -- | -- | 0 psig initial surface casing pressure. No samples taken |
402457938 | Form 17 | 7/27/2020 | 8/3/2020 | FLOWING | 23 | DOWN TO 0 | -- | 0 | NO FLOW | 203 | 203 | No | -- | -- | Annual. Case 2. 23 BHP. Down to 0 w/in 5 min. No samples. |
402161416 | Form 17 | 8/27/2019 | 8/29/2019 | FLOWING | 233 | DOWN TO 0 | -- | 0 | NO FLOW | 1542 | 1541 | Yes | No | No | First Sales. 233 psig initial surface casing. Down to 0 psig within five minutes. Gas sample taken. Crestone will submit a Form 4 sundry with a mitigation plan by 10-26-2019 per COGCC Order No. 1-232 NTO Guidance.
|
402058744 | Form 17 | 5/21/2019 | 5/30/2019 | FLOWING | 0 | NO FLOW | -- | 0 | NO FLOW | 2 | 1 | No | -- | -- | PRESTIM. 0 psig initial surface casing. No samples taken.
|