Click for Specifics | Full | 11/20/2024 | 12/10/2024 | | 17 | Continuous | -- | 0 | No Flow | 292 | 291 | No | No | No | Annual Test. 17 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
403620114 | Form 17 | 12/6/2023 | 12/11/2023 | SHUT-IN | 16 | CONTINUOUS | GAS | 0 | NO FLOW | 382 | 382 | No | -- | -- | Annual Test. 16 PSI blew down to 0 PSI in 17 minutes. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
Click for Specifics | Full | 11/23/2022 | 11/29/2022 | | 24 | Continuous | -- | 0 | No Flow | 360 | 355 | No | None | None | |
Click for Specifics | Light | 8/27/2021 | 9/6/2021 | Plunger Lift | 21 | | -- | 0 | | 348 | 345 | No | No | No | Test per NTO. Gas on open for 7 minutes and died. No flow for remainder of test. |
402538012 | Form 17 | 11/17/2020 | 11/23/2020 | PLUNGER LIFT | 38 | CONTINUOUS | GAS | 0 | NO FLOW | 444 | 444 | No | -- | -- | Test per 2020 NTO. Gas on open, died after 22 minutes. No flow for remainder of test. |
402083947 | Form 17 | 6/14/2019 | 6/21/2019 | SHUT-IN | 32 | CONTINUOUS | -- | 0 | NO FLOW | 1531 | 1533 | Yes | Yes | -- | Test after DOFP. Continuous gas flow thru 1/4" needle valve until ten minute mark, down to whisper and eventually died. BH and production gas sample collected for isotopic analysis. At the time of this submission, 6/21/19 1:00PM MST, BH had only built back to 16 PSI. |
401926135 | Form 17 | 1/26/2019 | 2/1/2019 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Test prior to toe prep/frac. |