Click for Specifics | Light | 7/17/2024 | 8/20/2024 | | 0 | | -- | 0 | | 249 | 248 | No | No | No | |
Click for Specifics | Light | 8/24/2023 | 9/25/2023 | Plunger Lift | 0 | | -- | 0 | | 253 | 253 | No | No | No | |
403150411 | Form 17 | 8/24/2022 | 8/29/2022 | FLOWING | 2 | DOWN TO 0 | GAS | 0 | NO FLOW | 321 | 338 | No | -- | -- | Mitigation Bradenhead Test
WBD attached
|
402769082 | Form 17 | 7/28/2021 | 8/5/2021 | FLOWING | 11 | DOWN TO 0 | GAS | 0 | NO FLOW | 398 | 416 | No | -- | -- | 11 psig initial surface casing pressure. No samples taken. |
402305340 | Form 17 | 1/8/2020 | 2/6/2020 | FLOWING | 23 | DOWN TO 0 | -- | 0 | NO FLOW | 742 | 741 | No | -- | -- | Annual. 23 psig initial surface casing pressure. Blew down to 0 psig within 5 minutes. No samples taken.
Crestone is submitting this form 17 test after the 10 day period due to the NTO operator guidance updated on 1/13/20 to submit "full" tests via eForms rather than the bulk upload tool and further verbal instructions given by the COGCC staff on 1/23/20 to Crestone that those performed prior to the guidance update would still be valid, if not submitted via eForm within the 10 day period.
|
Click for Specifics | Full | 1/8/2020 | 1/20/2020 | | 23 | Down To Zero | -- | 0 | No Flow | 742 | 741 | No | N | N | |
401947118 | Form 17 | 2/11/2019 | 2/21/2019 | FLOWING | 126 | CONTINUOUS | -- | 0 | NO FLOW | 2105 | 2105 | Yes | Yes | No | First Sales
|
401852419 | Form 17 | 11/26/2018 | 11/28/2018 | | 54 | WHISPER | -- | 0 | NO FLOW | 0 | 0 | Yes | Yes | -- | pre Stim |