| Click for Specifics | Full | 10/28/2025 | 11/5/2025 | | 0 | No Flow | -- | 0 | No Flow | 375 | 363 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. Operator will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Light | 10/20/2024 | 10/22/2024 | | 2 | | -- | 0 | | 356 | 349 | No | No | No | |
| Click for Specifics | Full | 12/8/2023 | 12/11/2023 | Plunger Lift | 0 | Down to Zero | -- | 0 | Down to Zero | 447 | 442 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 2/1/2022 | 2/21/2022 | | 0 | No Flow | -- | 0 | Down to Zero | 835 | 799 | No | No | No | |
| Click for Specifics | Full | 8/18/2021 | 11/1/2021 | | 0 | No Flow | -- | 0 | No Flow | 830 | 837 | No | None | None | |
| Click for Specifics | Light | 9/17/2020 | 12/3/2020 | | 0 | | -- | 0 | No Flow | 2 | 2 | No | No | No | |
| 402054922 | Form 17 | 5/20/2019 | 5/24/2019 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 2168 | 2167 | No | -- | -- | No fluid, no gas, no vapor. |
| 401909531 | Form 17 | 1/16/2019 | 1/17/2019 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | No fluid, gas or vapors. |