Click for Specifics | Light | 8/3/2024 | 9/19/2024 | | 0 | | -- | 0 | | 451 | 456 | No | No | No | |
Click for Specifics | Light | 8/24/2023 | 9/25/2023 | Flowing | 8 | | -- | 0 | | 445 | 448 | No | No | No | |
403143650 | Form 17 | 8/22/2022 | 8/23/2022 | FLOWING | 15 | DOWN TO 0 | GAS | 0 | NO FLOW | 479 | 483 | Yes | Yes | -- | Mitigation Bradenhead Test
WBD attached
|
402753669 | Form 17 | 7/19/2021 | 7/20/2021 | FLOWING | 48 | DOWN TO 0 | GAS | 0 | NO FLOW | 777 | 781 | No | -- | -- | 48 psig initial surface casing pressure. No samples taken |
402458587 | Form 17 | 7/31/2020 | 8/10/2020 | FLOWING | 96 | DOWN TO 0 | -- | 0 | NO FLOW | 1074 | 1073 | Yes | Yes | No | Annual. Case 2. 96 BHP to 0 w/in 5 min. BH sample. |
402112189 | Form 17 | 7/10/2019 | 7/20/2019 | FLOWING | 117 | DOWN TO 0 | -- | 0 | NO FLOW | 2598 | 2597 | Yes | Yes | No | First Sales. 117 psig initial surface casing. Down to 0 psig within five minutes. Gas sample taken. Crestone will submit a Form 4 sundry with a mitigation plan by 09-08-2019 per COGCC Order No. 1-232 NTO Guidance.
|
401971108 | Form 17 | 3/4/2019 | 3/13/2019 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Pre Stim
|