Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-47667Bost Farm
32N-11C-L
PDC ENERGY INC
69175
PR
5/26/2020
DJ HORIZONTAL NIOBRARA
16950
GREELEY/WELD  123
SWNW 7 5N66W 6
456832
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1786 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404399882Form 1710/13/202510/22/2025PLUNGER LIFT15DOWN TO 0 GAS0 NO FLOW 382369No----Remediation follow up test. 15 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy.
403976550Form 1710/29/202410/30/2024PLUNGER LIFT13DOWN TO 0 GAS0 NO FLOW 402387No----Remediation follow up test. 13 PSI gas flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull12/13/202312/18/2023Plunger Lift8Down to Zero--0Down to Zero382379NoNoNoAnnual Test. 8 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull1/28/20222/21/2022 36Down to Zero--0Down to Zero715749NoNoNo 
402894326Form 1711/29/202112/9/2021FLOWING13DOWN TO 0 --0 NO FLOW 773773No----Abatement system follow up test, 13 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly.
Click for SpecificsFull8/18/202111/1/2021 0No Flow--0No Flow942941NoNoneNone 
402499295Form 179/20/20209/29/2020FLOWING60GAS --0 NO FLOW 15971597No----Post production test, 60 PSI gas flow blew down to 0 PSI within first 5 min of test no pressure or flow observed for the remainder of test. PDC will attempt to collect a sample as submit results via form 43 as soon as possible. PDC will follow up with a remediation plan via sundry.
402163715Form 179/3/20199/3/2019SHUT-IN0NO FLOW --0 NO FLOW 00No----No gas, fluid or vapor. Post-drill, pre-frac bradenhead test.