Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-47666Bost Farm
31N-11C-L
PDC ENERGY INC
69175
PR
4/30/2020
DJ HORIZONTAL NIOBRARA
16950
GREELEY/WELD  123
SWNW 7 5N66W 6
456832
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1777 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404399864Form 1710/13/202510/22/2025PLUNGER LIFT10DOWN TO 0 GAS0 NO FLOW 300306No----Remediation follow up test. 10 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy.
403976506Form 1710/29/202410/30/2024PLUNGER LIFT14DOWN TO 0 GAS0 NO FLOW 331330No----Remediation follow up test. 14 PSI gas flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull12/13/202312/18/2023Plunger Lift7Down to Zero--0Down to Zero433432NoNoNoAnnual Test. 7 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull1/31/20222/21/2022 10Down to Zero--0Down to Zero656656NoNoNo 
402881315Form 1711/25/202111/29/2021FLOWING15DOWN TO 0 VAPOR0 NO FLOW 712712No----Abatement system follow up test, 15 PSI vapor flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly.
Click for SpecificsFull8/18/202111/1/2021 0No Flow--0No Flow859858NoNoneNone 
402499301Form 179/20/20209/29/2020FLOWING190GAS --0 NO FLOW 15681568No----Post production test, 190 PSI gas flow blew down to 0 PSI within first 10 min of test no pressure or flow observed for the remainder of test. PDC will collect a sample as submit results via form 43 as soon as possible. PDC will follow up with a remediation plan via sundry.
402163673Form 178/29/20199/3/2019SHUT-IN0NO FLOW --0 NO FLOW 00No----No gas, fluid or vapor. Post-drill, pre-frac bradenhead test.