| Click for Specifics | Full | 10/23/2025 | 10/27/2025 | | 3 | Continuous | -- | 0 | No Flow | 323 | 323 | No | No | No | Annual Test. 3 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Light | 10/20/2024 | 10/22/2024 | | 1 | | -- | 0 | | 417 | 413 | No | No | No | |
| Click for Specifics | Full | 12/8/2023 | 12/11/2023 | Plunger Lift | 2 | Down to Zero | -- | 0 | Down to Zero | 445 | 446 | No | No | No | Annual Test. 2 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 1/31/2022 | 2/21/2022 | | 1 | Down to Zero | -- | 0 | Down to Zero | 819 | 818 | No | No | No | |
| Click for Specifics | Full | 8/18/2021 | 11/1/2021 | | 0 | No Flow | -- | 0 | No Flow | 968 | 970 | No | None | None | |
| 402930409 | Form 17 | 9/16/2020 | 1/19/2022 | FLOWING | 1 | DOWN TO 0 | -- | 0 | NO FLOW | 1521 | 1521 | No | -- | -- | Post Production within 60 days of first sales, 1 PSI blew down to 0 PSI within first minute of test, no pressure or flow observed for the remainder of the test. PDC will monitor bradenhead pressure monthly and submit annual test. (Submitted as part of PDC's ongoing Bradenhead Clean-Up) |
| Click for Specifics | Light | 4/23/2020 | 12/14/2020 | | 12 | | -- | 0 | | 282 | 282 | No | No | No | |
| 402163691 | Form 17 | 8/29/2019 | 9/3/2019 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | No gas, fluid or vapor. Post-drill, pre-frac bradenhead test. |