| 404384606 | Form 17 | 8/7/2025 | 10/8/2025 | SHUT-IN | 8 | CONTINUOUS | WATER H20 | 0 | NO FLOW | 0 | 0 | No | -- | -- | Pre-P&A. 8 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. |
| 404209929 | Form 17 | 5/1/2025 | 5/19/2025 | SHUT-IN | 133 | CONTINUOUS | WATER AND GAS | 1 | WHISPER | 0 | 0 | No | -- | -- | Delayed Completions Test. 133 PSI gas and water blew down to 1 PSI within five minutes. Water observed for entire test, ~2 gals. Operator will collect a sample and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403991517 | Form 17 | 11/6/2024 | 11/12/2024 | | 46 | DOWN TO 0 | WATER AND GAS | 0 | CONTINUOUS | 0 | 0 | No | -- | -- | Delayed Completions Test. 46 PSI water and gas blew down to 0 PSI within seconds, water observed throughout entire test, ~ 1/2 gal. PDC will collect a sample and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403790903 | Form 17 | 5/9/2024 | 5/15/2024 | SHUT-IN | 78 | DOWN TO 0 | MUD AND GAS | 0 | CONTINUOUS | 0 | 0 | No | -- | -- | Delayed Completions Test. 78 PSI gas and fluid blew down to 0 PSI within 15 seconds. Fluid continued to trickle for 12 minutes, then dripped for the remainder of the test, ~1 gallon total fluid. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403618572 | Form 17 | 12/6/2023 | 12/7/2023 | SHUT-IN | 74 | CONTINUOUS | WATER AND GAS | 0 | CONTINUOUS | 0 | 0 | No | -- | -- | Delayed Completions Test. 74 PSI blew down to 0 PSI in 5 minutes. ~0.5 gallon fluid at open, light trickle for entire test, ~1 gallon total. |
| 403404084 | Form 17 | 5/11/2023 | 5/16/2023 | SHUT-IN | 80 | DOWN TO 0 | WATER AND GAS | 0 | CONTINUOUS | 0 | 0 | No | -- | -- | Delayed Completions Test. 80 PSI gas and water flow blew down to 0 PSI in 5 minutes. Fluid at open, steady drip for entire test. |
| 403298118 | Form 17 | 1/19/2023 | 1/23/2023 | SHUT-IN | 85 | DOWN TO 0 | WATER AND GAS | 0 | NO FLOW | 0 | 0 | Yes | Yes | Yes | Pre-P&A. 85 PSI blew down to 0 PSI within first few seconds of test. 1 quart water at open, then steady drip for 4 minutes. No pressure or flow observed for the remainder of the test. PDC collected a gas and water sample on 11/15/2022. |
| 403191755 | Form 17 | 10/6/2022 | 10/10/2022 | SHUT-IN | 300 | CONTINUOUS | WATER AND GAS | 0 | CONTINUOUS | 0 | 0 | Yes | -- | -- | Delayed Completions Test. 300 PSI gas and water flow blew down to 0 PSI within seconds, water continued for the entire test through 1/2" needle valve. PDC will collect a sample and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy. |
| 402857428 | Form 17 | 10/27/2021 | 10/29/2021 | SHUT-IN | 15 | DOWN TO 0 | WATER H20 | 0 | NO FLOW | 0 | 0 | No | -- | -- | DUC well.
Test per NTO. Water on open, produced ~ 1 cup and died. No flow for remainder of test. |
| 402468950 | Form 17 | 8/7/2020 | 8/17/2020 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Test 60 days after rig release. Drilled uncompleted. Vacuum at open, then dead. |