Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-46696J Clark
10N
PDC ENERGY INC
69175
PR
12/11/2018
WATTENBERG
90750
WELD  123
NWNE 14 5N65W 6
323242
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1676 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404567663Form 172/12/20263/5/2026PLUNGER LIFT58DOWN TO 0 WATER AND GAS0 CONTINUOUS 284290No---- 
Click for SpecificsFull2/20/20253/4/2025 4Down to Zero--0No Flow384384NoNoNoAnnual Test.  4 PSI blew down to 0 PSI within first few seconds of test.  No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
403684774Form 172/5/20242/12/2024PLUNGER LIFT18CONTINUOUS WATER AND GAS0 CONTINUOUS 263259No----Abatement system follow up test. 18 PSI gas and fluid flow blew down to 0 PSI within first few seconds of test. Water dripped for entire test. PDC will monitor pressure and re-test according to bradenhead policy.
403476431Form 177/25/20237/26/2023PLUNGER LIFT92CONTINUOUS GAS AND LIQUID HYDROCARBON0 CONTINUOUS 257252Yes----High Pressure Verification test. 92 PSI gas and fluid blew down to 0 PSI in 2 minutes. Fluid continued to trickle for remainder of test. PDC will monitor pressure and re-test according to bradenhead policy.
403350527Form 173/13/20233/20/2023PLUNGER LIFT28DOWN TO 0 WATER AND GAS0 CONTINUOUS 221222No----Annual Test. 28 PSI water and gas flow blew down to 0 PSI within first few seconds of test. Water trickled for entire test. PDC will continue to monitor monthly.
Click for SpecificsFull1/13/20222/21/2022 5Down to Zero--0No Flow255260NoNoNo 
Click for SpecificsFull4/21/202112/21/2021 47Water H2ONone3Gas376377NoNoneNone 
402448444Form 174/28/20207/22/2020 363WATER H20 --80 WATER H20 592594No----6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC.
402232826Form 1710/30/201911/6/2019FLOWING205CONTINUOUS --3 WHISPER 759759YesYes--Annual TEst 205 PSi contious gas flow forthe entire 30 min test. Blew down to 3 PSI at the end of the test. PDC has collected a sample and will submit results via form 43. PDC will submit a remedation plan via sundry.