| 404567663 | Form 17 | 2/12/2026 | 3/5/2026 | PLUNGER LIFT | 58 | DOWN TO 0 | WATER AND GAS | 0 | CONTINUOUS | 284 | 290 | No | -- | -- | |
| Click for Specifics | Full | 2/20/2025 | 3/4/2025 | | 4 | Down to Zero | -- | 0 | No Flow | 384 | 384 | No | No | No | Annual Test. 4 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403684774 | Form 17 | 2/5/2024 | 2/12/2024 | PLUNGER LIFT | 18 | CONTINUOUS | WATER AND GAS | 0 | CONTINUOUS | 263 | 259 | No | -- | -- | Abatement system follow up test. 18 PSI gas and fluid flow blew down to 0 PSI within first few seconds of test. Water dripped for entire test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403476431 | Form 17 | 7/25/2023 | 7/26/2023 | PLUNGER LIFT | 92 | CONTINUOUS | GAS AND LIQUID HYDROCARBON | 0 | CONTINUOUS | 257 | 252 | Yes | -- | -- | High Pressure Verification test. 92 PSI gas and fluid blew down to 0 PSI in 2 minutes. Fluid continued to trickle for remainder of test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403350527 | Form 17 | 3/13/2023 | 3/20/2023 | PLUNGER LIFT | 28 | DOWN TO 0 | WATER AND GAS | 0 | CONTINUOUS | 221 | 222 | No | -- | -- | Annual Test. 28 PSI water and gas flow blew down to 0 PSI within first few seconds of test. Water trickled for entire test. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 1/13/2022 | 2/21/2022 | | 5 | Down to Zero | -- | 0 | No Flow | 255 | 260 | No | No | No | |
| Click for Specifics | Full | 4/21/2021 | 12/21/2021 | | 47 | Water H2O | None | 3 | Gas | 376 | 377 | No | None | None | |
| 402448444 | Form 17 | 4/28/2020 | 7/22/2020 | | 363 | WATER H20 | -- | 80 | WATER H20 | 592 | 594 | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
| 402232826 | Form 17 | 10/30/2019 | 11/6/2019 | FLOWING | 205 | CONTINUOUS | -- | 3 | WHISPER | 759 | 759 | Yes | Yes | -- | Annual TEst 205 PSi contious gas flow forthe entire 30 min test. Blew down to 3 PSI at the end of the test. PDC has collected a sample and will submit results via form 43. PDC will submit a remedation plan via sundry. |