| 404587404 | Form 17 | 3/10/2026 | 3/19/2026 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 414 | 414 | No | -- | -- | Remediation follow up test. 0 PSI, no pressure or flow observed for entire of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 404129171 | Form 17 | 3/10/2025 | 3/14/2025 | INJECTION | 5 | CONTINUOUS | WATER AND GAS | 0 | WHISPER | 319 | 310 | No | -- | -- | Annual test. 5 PSI water and gas flow blew down to 0 PSI in thirty minutes, water and gas observed throughout continued entire test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403982887 | Form 17 | 8/19/2024 | 11/5/2024 | | 38 | CONTINUOUS | WATER AND GAS | 1 | CONTINUOUS | 301 | 303 | No | -- | -- | Engineering Ad Hoc test. 38 PSI water and gas blew down to 1 PSI within first five minutes of test. Slow water trickle observed throughout entire test. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 3/8/2024 | 4/1/2024 | | 0 | No Flow | -- | 0 | No Flow | 293 | 288 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 3/15/2023 | 3/27/2023 | | 0 | No Flow | -- | 0 | No Flow | 250 | 252 | No | None | None | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 3/15/2022 | 4/18/2022 | | 0 | No Flow | -- | 0 | No Flow | 310 | 306 | No | No | No | |
| 402721647 | Form 17 | 2/19/2021 | 6/17/2021 | PLUNGER LIFT | 0 | CONTINUOUS | WATER H20 | 0 | NO FLOW | 525 | 525 | No | -- | -- | Abatement system follow up test. No pressure observed for the duration of the test. Water observed for the first five minutes and then no flow for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. |
| 402407039 | Form 17 | 4/28/2020 | 5/27/2020 | | 50 | GAS | -- | 0 | DOWN TO 0 | 716 | 718 | Yes | -- | -- | Annual Test 50 PSI with continuous flow, blew down to 0 PSI after 30 min. PDC has collected a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry. |
| Click for Specifics | Light | 10/20/2019 | 8/18/2020 | | 40 | | -- | 0 | | 960 | 960 | No | No | No | |