Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-46694J Clark
5N
PDC ENERGY INC
69175
PR
12/1/2025
WATTENBERG
90750
WELD  123
NWNE 14 5N65W 6
323242
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1675 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404587404Form 173/10/20263/19/2026SHUT-IN0NO FLOW NONE0 NO FLOW 414414No----Remediation follow up test. 0 PSI, no pressure or flow observed for entire of the test. Operator will monitor pressure and re-test according to bradenhead policy.
404129171Form 173/10/20253/14/2025INJECTION5CONTINUOUS WATER AND GAS0 WHISPER 319310No----Annual test. 5 PSI water and gas flow blew down to 0 PSI in thirty minutes, water and gas observed throughout continued entire test. PDC will monitor pressure and re-test according to bradenhead policy.
403982887Form 178/19/202411/5/2024 38CONTINUOUS WATER AND GAS1 CONTINUOUS 301303No----Engineering Ad Hoc test. 38 PSI water and gas blew down to 1 PSI within first five minutes of test. Slow water trickle observed throughout entire test. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly.
Click for SpecificsFull3/8/20244/1/2024 0No Flow--0No Flow293288NoNoNoAnnual Test.  0 PSI, with no pressure or flow observed for the entire 30-minute test.  PDC will monitor pressure and re-test according to bradenhead policy.
Click for SpecificsFull3/15/20233/27/2023 0No Flow--0No Flow250252NoNoneNoneAnnual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will continue to monitor monthly.
Click for SpecificsFull3/15/20224/18/2022 0No Flow--0No Flow310306NoNoNo 
402721647Form 172/19/20216/17/2021PLUNGER LIFT0CONTINUOUS WATER H200 NO FLOW 525525No----Abatement system follow up test. No pressure observed for the duration of the test. Water observed for the first five minutes and then no flow for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible.
402407039Form 174/28/20205/27/2020 50GAS --0 DOWN TO 0 716718Yes----Annual Test 50 PSI with continuous flow, blew down to 0 PSI after 30 min. PDC has collected a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry.
Click for SpecificsLight10/20/20198/18/2020 40 --0 960960NoNoNo