Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-46693J Clark
14N
PDC ENERGY INC
69175
PR
8/1/2024
WATTENBERG
90750
WELD  123
NWNE 14 5N65W 6
323242
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1677 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
403684789Form 172/5/20242/12/2024PLUNGER LIFT9DOWN TO 0 GAS0 NO FLOW 292301No----Abatement system follow up test. 9 PSI gas flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
403502602Form 178/17/20238/21/2023PLUNGER LIFT54CONTINUOUS WATER AND GAS0 CONTINUOUS 239240Yes----High Pressure Verification test. 54 PSI gas and water flow blew down to 0 PSI in seconds, water trickled for entire test. PDC will monitor pressure and re-test according to bradenhead policy.
403350798Form 173/13/20233/20/2023PLUNGER LIFT26DOWN TO 0 WATER AND GAS0 NO FLOW 211211No----Annual Test. 26 PSI water and gas flow blew down to 0 PSI within first 5 minutes of test. No flow or pressure for remainder of test. PDC will continue to monitor monthly.
Click for SpecificsFull3/14/20224/18/2022 18Continuous--0No Flow267261NoNoNo 
402816087Form 179/15/20219/20/2021PLUNGER LIFT5DOWN TO 0 WATER H200 NO FLOW 313316No----Abatement system follow up test, 5 PSI water flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly.
402670352Form 174/21/20214/26/2021 74CONTINUOUS WATER H201 CONTINUOUS 493507Yes----Annual Test 74 PSI with continuous flow, blew down to 1 PSI after 30 min. PDC has collected a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry.
402769987Form 179/22/20208/4/2021FLOWING20CONTINUOUS WATER H202  656656No----Abatement system follow up test, 20 PSI water flow blew down to 2 PSI within thirty minutes. PDC will submit sundry with bradenhead details as soon as possible. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly.
402448647Form 174/30/20207/22/2020 106WATER H20 --100 CONTINUOUS 726726No----6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC.
402236382Form 1711/4/201911/12/2019FLOWING140GAS --7 WHISPER 907907YesYes--Annual Test 140 PSI slight gas flow blew down to a whisper for the duration of the 30 min test. 7 PSI at the end of the test. PDC has collected a sample and will submit to COGCC via form 43. PDC will submit a remediation plan via sundry.