| 404554639 | Form 17 | 2/11/2026 | 2/23/2026 | SHUT-IN | 36 | DOWN TO 0 | WATER AND GAS | 0 | CONTINUOUS | 495 | 495 | No | -- | -- | |
| 404129152 | Form 17 | 2/26/2025 | 3/14/2025 | PLUNGER LIFT | 93 | CONTINUOUS | WATER AND GAS | 0 | NO FLOW | 293 | 293 | No | -- | -- | Remediation follow up test. 93 PSI blew down to 0 PSI within five minutes of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 3/15/2024 | 4/1/2024 | | 10 | Down to Zero | -- | 0 | No Flow | 355 | 355 | No | No | No | Annual Test. 10 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403349904 | Form 17 | 3/13/2023 | 3/20/2023 | PLUNGER LIFT | 50 | DOWN TO 0 | WATER AND GAS | 0 | CONTINUOUS | 226 | 229 | No | -- | -- | Annual Test. 50 PSI water and gas flow blew down to 0 PSI within first minute of test. Water trickled for entire test. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 3/15/2022 | 4/18/2022 | | 34 | Down to Zero | -- | 0 | Continuous | 331 | 335 | No | No | No | |
| 402866656 | Form 17 | 9/24/2021 | 11/9/2021 | PLUNGER LIFT | 70 | CONTINUOUS | -- | 0 | NO FLOW | 392 | 389 | Yes | -- | -- | Post-production, 70 PSI blew down to 0 PSI within first 5 minutes. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will schedule a sampling event and submit results via form 43. |
| Click for Specifics | Full | 4/12/2021 | 11/1/2021 | | 0 | No Flow | -- | 0 | No Flow | 740 | 740 | No | None | None | |
| Click for Specifics | Light | 4/28/2020 | 5/11/2020 | | 8 | | -- | 8 | | 828 | 828 | No | No | No | |
| Click for Specifics | Light | 10/20/2019 | 8/18/2020 | | 8 | | -- | 0 | | 838 | 838 | No | No | No | |