| 404323700 | Form 17 | 8/1/2025 | 8/20/2025 | PLUNGER LIFT | 28 | DOWN TO 0 | GAS | 0 | NO FLOW | 353 | 353 | No | -- | -- | Remediation follow up test. 28 PSI gas and water, blew down to 0 in ten minutes. No pressure or flow observed for remainder of test. Operator will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Light | 2/2/2025 | 2/10/2025 | | 9 | | -- | 0 | | 242 | 243 | No | No | No | |
| 403988659 | Form 17 | 11/7/2024 | 11/8/2024 | | 83 | CONTINUOUS | WATER AND GAS | 0 | WHISPER | 266 | 265 | No | -- | -- | Annual Test. 83 PSI water and gas, blew down to 0 within thirty minutes of test. Whisper gas and water observed throughout entire test. PDC will schedule a sampling event and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403722904 | Form 17 | 3/14/2024 | 3/18/2024 | PLUNGER LIFT | 4 | CONTINUOUS | WATER AND GAS | 0 | NO FLOW | 284 | 287 | No | -- | -- | Annual test. 4 PSI gas and fluid flow blew down to 0 PSI in 5 minutes, no flow or pressure for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403355051 | Form 17 | 3/17/2023 | 3/23/2023 | PLUNGER LIFT | 14 | CONTINUOUS | WATER AND GAS | 0 | NO FLOW | 245 | 246 | No | -- | -- | Annual Test. 14 PSI water and gas flow blew down to 0 PSI within first minute of test. Water continued for 10 minutes, then no flow or pressure for remainder of test. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 3/14/2022 | 4/18/2022 | | 17 | Down to Zero | -- | 0 | Down to Zero | 293 | 299 | No | No | No | |
| 402815978 | Form 17 | 9/15/2021 | 9/20/2021 | PLUNGER LIFT | 17 | DOWN TO 0 | -- | 0 | NO FLOW | 432 | 431 | No | -- | -- | Abatement system follow up test, 17 PSI whisper blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. |
| 402670102 | Form 17 | 4/19/2021 | 4/26/2021 | | 120 | WHISPER | GAS | 0 | NO FLOW | 551 | 552 | Yes | -- | -- | Annual Test 120 PSI with continuous flow, blew down to 0 PSI after 30 min. PDC has collected a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry. |
| 402769811 | Form 17 | 11/12/2020 | 8/4/2021 | FLOWING | 16 | DOWN TO 0 | -- | 0 | NO FLOW | 700 | 700 | No | -- | -- | Abatement system follow up test, 16 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. |
| 402448390 | Form 17 | 4/27/2020 | 7/22/2020 | | 64 | WATER H20 | -- | 62 | WATER H20 | 768 | 686 | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
| 402239536 | Form 17 | 11/7/2019 | 11/14/2019 | FLOWING | 136 | CONTINUOUS | -- | 20 | GAS | 1051 | 1046 | Yes | Yes | -- | Annual Test 136 PSI continous gas flow throughout the 30 min test, 20 PSI at the end of the test. PDC has collected a gas sample and will submit results via form 43. PDC has submitted a remediation plan via sundry |