| 404554629 | Form 17 | 2/11/2026 | 2/23/2026 | SHUT-IN | 13 | DOWN TO 0 | WATER AND GAS | 0 | CONTINUOUS | 25 | 25 | No | -- | -- | |
| 404129148 | Form 17 | 2/27/2025 | 3/14/2025 | PLUNGER LIFT | 7 | CONTINUOUS | WATER AND GAS | 1 | CONTINUOUS | 389 | 389 | No | -- | -- | Remediation follow up test. 7 PSI continuous gas and water flow blew down to 1 PSI within thirty minutes. Gas and water observed throughout entire test, ~5 gals. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403722355 | Form 17 | 3/15/2024 | 3/18/2024 | PLUNGER LIFT | 82 | DOWN TO 0 | WATER AND GAS | 8 | CONTINUOUS | 294 | 296 | No | -- | -- | Abatement System Follow-Up test. 82 PSI fluid flow blew down to 4 PSI in 30 minutes, slight gas on open, ~15 gallons of fluid. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403547486 | Form 17 | 9/27/2023 | 10/2/2023 | PLUNGER LIFT | 53 | CONTINUOUS | WATER AND GAS | 0 | CONTINUOUS | 264 | 275 | Yes | -- | -- | Automation Alert follow-up test. 53 PSI gas and water flow blew down to 0 PSI in 5 minutes. Water was steady stream for entire test. PDC will schedule a sampling event and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 3/13/2023 | 3/27/2023 | | 0 | No Flow | -- | 0 | No Flow | 243 | 237 | No | None | None | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 3/15/2022 | 4/18/2022 | | 18 | Down to Zero | -- | 0 | No Flow | 345 | 349 | No | No | No | |
| 402670223 | Form 17 | 2/19/2021 | 4/26/2021 | | 100 | CONTINUOUS | WATER H20 | 50 | CONTINUOUS | 556 | 555 | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
| 402620971 | Form 17 | 2/19/2021 | 3/8/2021 | | 100 | CONTINUOUS | GAS | 50 | CONTINUOUS | 556 | 555 | No | -- | -- | Abatement system follow up test, 100 PSI blew down to 50. PDC will continue to monitor and re-test in 6 months. PDC will evaluate the abatement system |
| 402407047 | Form 17 | 4/28/2020 | 5/27/2020 | | 79 | GAS | -- | 0 | DOWN TO 0 | 706 | 706 | Yes | -- | -- | Annual Test 79 PSI with continuous flow, blew down to 0 PSI after 30 min. PDC has collected a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry. |
| Click for Specifics | Light | 10/20/2019 | 8/18/2020 | | 27 | | -- | 0 | | 882 | 882 | No | No | No | |