| 404554966 | Form 17 | 2/12/2026 | 2/23/2026 | SHUT-IN | 24 | DOWN TO 0 | WATER AND GAS | 0 | CONTINUOUS | 374 | 373 | No | -- | -- | |
| 404129082 | Form 17 | 2/28/2025 | 3/14/2025 | PLUNGER LIFT | 38 | CONTINUOUS | WATER AND GAS | 1 | CONTINUOUS | 399 | 399 | No | -- | -- | Remediation follow up test. 38 PSI continuous gas and water flow blew down to 1 PSI within thirty minutes. Gas and water observed throughout entire test, ~5 gals. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403728701 | Form 17 | 3/22/2024 | 3/22/2024 | PLUNGER LIFT | 26 | DOWN TO 0 | WATER AND GAS | 0 | NO FLOW | 344 | 320 | No | -- | -- | Annual test. 26 PSI water and gas flow blew down to 0 PSI in 5 minutes. Water continued to trickle for 15 minutes, no flow or pressure for remainder of test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403350580 | Form 17 | 3/13/2023 | 3/20/2023 | PLUNGER LIFT | 6 | DOWN TO 0 | WATER AND GAS | 0 | CONTINUOUS | 228 | 228 | No | -- | -- | Annual Test. 6 PSI water and gas flow blew down to 0 PSI within first few seconds of test. Water trickled the entire test. PDC will continue to monitor monthly. |
| 403216574 | Form 17 | 11/1/2022 | 11/2/2022 | PLUNGER LIFT | 7 | DOWN TO 0 | GAS | 0 | NO FLOW | 295 | 297 | No | -- | -- | Abatement system follow up test. 7 PSI gas flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. |
| 402984410 | Form 17 | 3/14/2022 | 3/15/2022 | PLUNGER LIFT | 72 | CONTINUOUS | WATER AND GAS | 0 | WHISPER | 238 | 238 | Yes | -- | -- | Annual Test, 72 PSI gas and water flow blew down to 0 PSI within 30 minutes. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. PDC will continue to monitor monthly. |
| 402721608 | Form 17 | 4/21/2021 | 6/17/2021 | PLUNGER LIFT | 17 | CONTINUOUS | WATER H20 | 15 | CONTINUOUS | 397 | 397 | No | -- | -- | Abatement system follow up test, 17 PSI continuous water flow blew down to 15 PSI within thirty minutes. PDC will submit sundry with bradenhead details as soon as possible. PDC will schedule a sampling event and submit results via form 43. |
| 402871611 | Form 17 | 3/10/2021 | 11/16/2021 | PLUNGER LIFT | 135 | CONTINUOUS | WATER H20 | 1 | WHISPER | 467 | 467 | Yes | -- | -- | Post-production, 135 PSI water flow blew down to 1 PSI in thirty minutes. PDC will schedule a sampling event and submit results via form 43. PDC will continue to monitor monthly. |
| 402518375 | Form 17 | 10/12/2020 | 10/26/2020 | | 59 | DOWN TO 0 | -- | 0 | NO FLOW | 749 | 749 | Yes | -- | -- | Annual Test 59 PSI with continuous flow, blew down to 0 PSI after 30 min. PDC has collected a sample and will submit via 43 ASAP. PDC will follow up with a remediation plan via sundry. |
| Click for Specifics | Light | 4/30/2020 | 5/11/2020 | | 15 | | -- | 15 | | 825 | 825 | No | No | No | |
| Click for Specifics | Light | 10/20/2019 | 8/18/2020 | | 0 | | -- | 0 | | 853 | 853 | No | No | No | |