| 404554622 | Form 17 | 2/11/2026 | 2/23/2026 | PLUNGER LIFT | 18 | DOWN TO 0 | WATER AND GAS | 0 | CONTINUOUS | 393 | 398 | No | -- | -- | |
| 404129136 | Form 17 | 2/27/2025 | 3/14/2025 | PLUNGER LIFT | 22 | CONTINUOUS | WATER AND GAS | 1 | CONTINUOUS | 347 | 350 | No | -- | -- | Remediation follow up test. 22 PSI continuous gas and water flow blew down to 1 PSI within thirty minutes. Gas and water observed throughout entire test, ~5 gals. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403722942 | Form 17 | 3/14/2024 | 3/18/2024 | PLUNGER LIFT | 14 | DOWN TO 0 | GAS | 4 | CONTINUOUS | 277 | 273 | No | -- | -- | Annual test. 14 PSI blew down to 0 PSI within 5 minutes. Fluid started at 13 minute mark and lasted for the remainder of the 30 minute test, ending at 4 PSI. ~3 gallons total fluid. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403355055 | Form 17 | 3/17/2023 | 3/23/2023 | PLUNGER LIFT | 12 | CONTINUOUS | WATER AND GAS | 0 | NO FLOW | 267 | 267 | No | -- | -- | Annual Test. 12 PSI water and gas flow blew down to 0 PSI within first minute of test. Water continued for 10 minutes, then no flow or pressure for remainder of test. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 3/14/2022 | 4/18/2022 | | 19 | Down to Zero | -- | 0 | Down to Zero | 288 | 284 | No | No | No | |
| 402721638 | Form 17 | 4/19/2021 | 6/17/2021 | PLUNGER LIFT | 35 | DOWN TO 0 | WATER AND MUD | 0 | | 590 | 589 | No | -- | -- | Abatement system follow up test, 35 PSI slight water and mud flow blew down to 0 PSI within first minute of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. |
| Click for Specifics | Full | 4/19/2021 | 11/1/2021 | | 35 | Water H2O | -- | 0 | Gas | 590 | 593 | No | None | None | |
| 402564728 | Form 17 | 12/12/2020 | 12/31/2020 | FLOWING | 65 | WHISPER | GAS | 0 | NO FLOW | 730 | 730 | No | -- | -- | Abatement system follow up Test, 65 PSI slight gas blew down to 0 PSI within seconds. No pressure or flow observed for the remainder of the test. |
| 402448422 | Form 17 | 4/27/2020 | 7/22/2020 | | 95 | WATER H20 | -- | 85 | WATER H20 | 740 | 739 | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
| 402244420 | Form 17 | 11/20/2019 | 11/20/2019 | FLOWING | 194 | GAS | -- | 1 | GAS | 1006 | 1006 | Yes | Yes | -- | 194 PSI slight gas flow blew down to 1 PSI at the end of the 30 min test. PDC has collected a sample and will submit results via form 43 as soon as possible. PDC will submit a remediation plan via sundry. |