| 404554609 | Form 17 | 2/11/2026 | 2/23/2026 | SHUT-IN | 42 | DOWN TO 0 | GAS | 0 | NO FLOW | 444 | 444 | No | -- | -- | |
| 404129128 | Form 17 | 2/27/2025 | 3/14/2025 | PLUNGER LIFT | 18 | CONTINUOUS | WATER AND GAS | 1 | CONTINUOUS | 323 | 324 | No | -- | -- | Remediation follow up test. 18 PSI continuous gas and water flow blew down to 1 PSI within thirty minutes. Gas and water observed throughout entire test, ~5 gals. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403722910 | Form 17 | 3/14/2024 | 3/18/2024 | PLUNGER LIFT | 14 | DOWN TO 0 | WATER AND GAS | 0 | NO FLOW | 258 | 263 | No | -- | -- | Annual test. 14 PSI gas and fluid flow blew down to 0 PSI in 5 minutes, no flow or pressure for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403350612 | Form 17 | 3/17/2023 | 3/20/2023 | PLUNGER LIFT | 25 | DOWN TO 0 | WATER AND GAS | 0 | CONTINUOUS | 240 | 242 | No | -- | -- | Annual Test. 25 PSI water and gas flow blew down to 0 PSI within first few seconds of test. Water trickled the entire test. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 3/14/2022 | 4/18/2022 | | 20 | Down to Zero | -- | 0 | Down to Zero | 288 | 284 | No | No | No | |
| 402784826 | Form 17 | 4/19/2021 | 8/18/2021 | PLUNGER LIFT | 15 | CONTINUOUS | WATER AND GAS | 0 | NO FLOW | 575 | 575 | No | -- | -- | Annual Test,15 PSI water and gas flow blew down to 0 PSI within first few minutes of test. No pressure or flow observed for the remainder of the test. PDC will continue to monitor monthly. |
| 402425944 | Form 17 | 4/27/2020 | 6/18/2020 | | 0 | WHISPER | -- | 0 | WHISPER | 774 | 774 | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
| 402232854 | Form 17 | 10/30/2019 | 11/6/2019 | FLOWING | 95 | DOWN TO 0 | -- | 0 | NO FLOW | 1043 | 1043 | No | -- | -- | Annual Test 95 PSI blew down to 0 PSI instantly no pressure or flow observed for the remainder of the test. PDC will attempt to collect a sample and submit results via form 43. PDc will submit a remediation plan via sundry. |