| Click for Specifics | Full | 3/2/2026 | 3/9/2026 | | 0 | No Flow | -- | 0 | No Flow | 391 | 391 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. Operator will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Light | 2/27/2025 | 3/4/2025 | | 0 | | -- | 0 | | 365 | 366 | No | No | No | |
| Click for Specifics | Full | 3/14/2024 | 4/1/2024 | | 0 | No Flow | -- | 0 | No Flow | 257 | 253 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 3/15/2023 | 3/27/2023 | | 0 | No Flow | -- | 0 | No Flow | 221 | 221 | No | None | None | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will continue to monitor monthly. |
| 402924937 | Form 17 | 1/12/2022 | 1/13/2022 | PLUNGER LIFT | 0 | NO FLOW | -- | 0 | NO FLOW | 310 | 310 | No | -- | -- | Abatement system follow up test. No pressure or flow observed. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. |
| 402734909 | Form 17 | 3/11/2021 | 6/30/2021 | PLUNGER LIFT | 3 | WHISPER | GAS | 0 | NO FLOW | 625 | 625 | No | -- | -- | Post-Production - Monthly Follow-up. 3 PSI whisper gas blew down to 0 PSI within first fifteen minutes. No pressure or flow observed for the remainder of the test. |
| 402734931 | Form 17 | 2/17/2021 | 6/30/2021 | PLUNGER LIFT | 56 | CONTINUOUS | GAS | 0 | NO FLOW | 619 | 619 | No | -- | -- | Post-Production - Monthly Follow-up. 56 PSI blew down to 0 PSI within thirty minutes. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. |
| Click for Specifics | Light | 4/30/2020 | 5/11/2020 | | 13 | | -- | 13 | | 739 | 739 | No | No | No | |
| Click for Specifics | Light | 10/20/2019 | 8/18/2020 | | 4 | | -- | 0 | | 926 | 926 | No | No | No | |