| 404554895 | Form 17 | 2/12/2026 | 2/23/2026 | PLUNGER LIFT | 18 | DOWN TO 0 | WATER AND GAS | 0 | CONTINUOUS | 234 | 323 | No | -- | -- | |
| 404129118 | Form 17 | 2/28/2025 | 3/14/2025 | PLUNGER LIFT | 12 | NO FLOW | NONE | 0 | NO FLOW | 311 | 307 | No | -- | -- | Remediation follow up test. 12 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403722373 | Form 17 | 3/14/2024 | 3/18/2024 | PLUNGER LIFT | 49 | CONTINUOUS | WATER AND GAS | 12 | CONTINUOUS | 253 | 253 | No | -- | -- | Annual test. 49 PSI constant water flow blew down to 12 PSI in 30 minutes, ~15 gallons total fluid, slight gas on open. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403577576 | Form 17 | 10/24/2023 | 10/31/2023 | PLUNGER LIFT | 52 | CONTINUOUS | WATER AND GAS | 0 | DOWN TO 0 | 251 | 252 | Yes | -- | -- | Automation Alert follow-up test. 52 PSI water and gas flow blew down to 0 PSI in 15 minutes, ~3.5 gallons fluid. No flow or pressure for remainder of test. PDC will schedule a sampling event and submit results via form 43. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403350808 | Form 17 | 3/13/2023 | 3/20/2023 | PLUNGER LIFT | 20 | DOWN TO 0 | WATER AND GAS | 0 | NO FLOW | 245 | 244 | No | -- | -- | Annual Test. 20 PSI water and gas flow blew down to 0 PSI within first 5 minutes of test. No flow or pressure for remainder of test. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 3/14/2022 | 4/18/2022 | | 22 | Continuous | -- | 0 | No Flow | 338 | 340 | No | No | No | |
| Click for Specifics | Full | 4/21/2021 | 11/1/2021 | | 15 | Water H2O | -- | 0 | Down to Zero | 565 | 566 | No | None | None | |
| 402448569 | Form 17 | 4/30/2020 | 7/22/2020 | | 106 | WATER H20 | -- | 99 | WATER H20 | 698 | 698 | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
| 402232801 | Form 17 | 10/30/2019 | 11/6/2019 | FLOWING | 120 | CONTINUOUS | -- | 1 | WHISPER | 914 | 913 | Yes | Yes | -- | Annual Test 120 PSI slgiht gas flow bblew down to a whisper, 1 PSI at the end of the test. PDC has collected a sample and will submit results via form 43. PDC will submit a remediation plan via sundry. |