Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-46440GRACIE
24-11HZ
KERR MCGEE OIL & GAS ONSHORE LP
47120
PR
7/4/2019
WATTENBERG
90750
WELD  123
SWSE 24 2N66W 6
432526
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1860 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
Click for SpecificsFull6/19/20257/21/2025 1WhisperNone0No Flow185192NoNN Surface Casing produced no liquid.
Click for SpecificsFull3/28/20246/18/2024 3ContinuousNone--No Flow194200NoNN Surface Casing produced no liquid.
Click for SpecificsFull2/27/20233/8/2023Plunger Lift2ContinuousNone--No Flow193190NoNN Surface Casing produced no liquid.
Click for SpecificsFull8/22/202211/14/2022Plunger Lift3ContinuousNone--No Flow243247NoNN Surface Casing produced no liquid.
Click for SpecificsFull10/22/202111/24/2021Plunger Lift6ContinuousNone--Whisper293295NoNN Surface Casing produced no liquid.
Click for SpecificsFull11/23/202012/21/2020Plunger Lift3CONTINUOUS ----DOWN TO 0 409404NoNoNo Surface Casing produced no liquid.
402115870Form 177/16/20197/19/2019PLUNGER LIFT8GAS --1 WHISPER 26282627No----surface casing produced no fluids. 15 minute shut in results in whisper. 30 minute shut in results in 0 psi
402113373Form 177/16/20197/18/2019PLUNGER LIFT8GAS --1 WHISPER 26282627No----surface casing produced no fluids. 15 minute shut in results in whisper. 30 minute blow down results in 0 psi.
401984995Form 173/15/20193/26/2019PLUNGER LIFT1GAS --0 DOWN TO 0 ----No----Surface casing produced no fluid. Well shut in for 15min ended with no psi. Tubing shut in.
401770244Form 179/13/20189/21/2018 1WHISPER --0 DOWN TO 0 9191No----Surface casing produced no fluids. Surface casing shut in for 15 minutes ended with 0 PSI. No tubing. Post Drill Form 17