Click for Specifics | Full | 9/16/2024 | 9/23/2024 | | 0 | No Flow | -- | 0 | No Flow | 398 | 396 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
Click for Specifics | Full | 10/24/2023 | 10/31/2023 | Plunger Lift | 0 | No Flow | -- | 0 | No Flow | 524 | 530 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
Click for Specifics | Full | 6/7/2022 | 7/6/2022 | | 0 | Down to Zero | -- | 0 | Down to Zero | 441 | 441 | No | None | None | |
Click for Specifics | Full | 3/26/2021 | 11/1/2021 | | 0 | No Flow | -- | 0 | No Flow | 349 | 347 | No | None | None | |
Click for Specifics | Light | 4/17/2020 | 5/11/2020 | | 0 | | -- | 0 | | 924 | 924 | No | No | No | |
Click for Specifics | Light | 6/4/2019 | 11/27/2019 | | 5 | | | 0 | No Flow | 1256 | 1256 | No | No | No | |
401842711 | Form 17 | 11/14/2018 | 11/16/2018 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 2 | 2 | No | -- | -- | No gas, vapors or fluid. |
401669360 | Form 17 | 6/9/2018 | 6/11/2018 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | No fluid, gas or vapor. |