403815862 | Form 17 | 5/28/2024 | 6/6/2024 | GAS LIFT | 41 | DOWN TO 0 | VAPOR | 0 | NO FLOW | 872 | 873 | No | -- | -- | Bradenhead test was conducted due to bradenhead pressure being above the action threshold during monthly monitoring. |
403693858 | Form 17 | 2/13/2024 | 2/21/2024 | FLOWING | 58 | WHISPER | NONE | 0 | WHISPER | 329 | 501 | No | -- | -- | Bradenhead pressure to zero in 8 seconds. |
Click for Specifics | Full | 9/30/2023 | 10/16/2023 | | 62 | Whisper | -- | 0 | No Flow | 791 | 782 | No | No | No | Bradenhead pressure to zero within 40 seconds |
403719670 | Form 17 | 9/30/2023 | 3/14/2024 | | 62 | WHISPER | NONE | 0 | NO FLOW | 791 | 782 | No | -- | -- | Bradenhead pressure went to zero in 40 seconds. |
403124157 | Form 17 | 7/29/2022 | 8/2/2022 | FLOWING | 0 | NO FLOW | NONE | 0 | NO FLOW | 55 | 55 | No | -- | -- | BRT Post First Production |
402989782 | Form 17 | 3/19/2022 | 3/21/2022 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 0 | 0 | No | -- | -- | BRT Post Drilling before Frac |