Click for Specifics | Light | 6/6/2024 | 7/23/2024 | | 20 | | -- | 0 | | 796 | 796 | No | No | No | |
Click for Specifics | Light | 6/2/2023 | 7/17/2023 | Plunger Lift | 25 | | -- | 0 | | 301 | 297 | No | No | No | |
Click for Specifics | Light | 2/22/2022 | 3/22/2022 | Plunger Lift | 27 | | -- | 0 | | 373 | 373 | No | No | No | |
Click for Specifics | Light | 1/26/2021 | 2/16/2021 | Flowing | 30 | | -- | 0 | NO FLOW | 560 | 563 | No | No | No | |
402301254 | Form 17 | 1/27/2020 | 2/4/2020 | FLOWING | 34 | DOWN TO 0 | -- | 0 | NO FLOW | 702 | 701 | No | -- | -- | Annual. 34 psig initial surface casing pressure. Blew down to 0 psig within five minutes. No samples taken.
|
402038151 | Form 17 | 4/30/2019 | 5/10/2019 | FLOWING | 50 | WHISPER | -- | 0 | NO FLOW | 1204 | 1195 | Yes | Yes | No | First Sales. 50 psig initial surface casing. Down to 0 psig in five minutes. Gas sample taken. Crestone will submit a Form 4 sundry with a mitigation plan by 06-29-2019 per COGCC Order No. 1-232 NTO Guidance.
|
401881861 | Form 17 | 12/18/2018 | 12/20/2018 | SHUT-IN | 255 | WHISPER | -- | 17 | NO FLOW | 0 | 0 | Yes | Yes | -- | post drill pre-stim |