Click for Specifics | Light | 6/6/2024 | 7/23/2024 | | 3 | | -- | 0 | | 845 | 845 | No | No | No | |
Click for Specifics | Light | 6/2/2023 | 7/17/2023 | Plunger Lift | 9 | | -- | 0 | | 597 | 598 | No | No | No | |
Click for Specifics | Light | 2/22/2022 | 3/22/2022 | Plunger Lift | 12 | | -- | 0 | | 586 | 586 | No | No | No | |
402590066 | Form 17 | 1/26/2021 | 4/1/2021 | FLOWING | 16 | DOWN TO 0 | NONE | 0 | NO FLOW | 400 | 422 | No | -- | -- | 16 psig initial surface casing pressure. No samples taken. |
402428998 | Form 17 | 6/19/2020 | 6/23/2020 | FLOWING | 17 | DOWN TO 0 | -- | 0 | NO FLOW | 515 | 512 | No | -- | -- | Annual. Case 2. 17 psig initial surface casing pressure. Down to 0 in under 5 minutes. No samples. |
402038160 | Form 17 | 5/2/2019 | 5/10/2019 | FLOWING | 164 | WHISPER | -- | 0 | NO FLOW | 1171 | 1264 | Yes | Yes | No | First Sales. 164 psig initial surface casing. Down to 0 psig in five minutes. Gas sample taken. Crestone will submit a Form 4 sundry with a mitigation plan by 07-01-2019 per COGCC Order No. 1-232 NTO Guidance.
|
401881851 | Form 17 | 12/18/2018 | 12/20/2018 | SHUT-IN | 139 | WHISPER | -- | 0 | NO FLOW | 0 | 0 | Yes | Yes | -- | post drill pre-stim |