Click for Specifics | Full | 8/5/2024 | 9/11/2024 | | 1 | Whisper | None | -- | Whisper | 387 | 394 | No | N | N | Surface Casing produced no liquid. |
Click for Specifics | Full | 10/10/2023 | 11/6/2023 | Plunger Lift | 27 | Continuous | None | -- | No Flow | 300 | 303 | No | N | N | Surface Casing produced no liquid. |
Click for Specifics | Full | 8/10/2022 | 11/14/2022 | Plunger Lift | 28 | Continuous | None | -- | Whisper | 706 | 716 | No | N | N | Surface Casing produced no liquid. |
402721836 | Form 17 | 6/15/2021 | 6/17/2021 | | 17 | CONTINUOUS | GAS | 1 | WHISPER | 2401 | 2401 | No | -- | -- | Tubing shut in. Surface Casing produced no liquid. |
402527383 | Form 17 | 11/6/2020 | 11/6/2020 | | 11 | CONTINUOUS | GAS | 1 | WHISPER | 0 | 0 | No | -- | -- | No Tubing Installed. Casing dead. Surface Casing produced no liquid. |
402399586 | Form 17 | 5/8/2020 | 5/15/2020 | | 10 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | No Tubing Installed. Casing produced no pressure. Surface Casing produced no liquid. |
402241653 | Form 17 | 11/13/2019 | 11/18/2019 | PLUNGER LIFT | 40 | GAS | -- | 0 | WHISPER | 0 | 0 | No | -- | -- | surface casing produced no fluids. tubing and casing on vac |
402053322 | Form 17 | 5/14/2019 | 5/23/2019 | PLUNGER LIFT | 16 | GAS | -- | 0 | DOWN TO 0 | -- | -- | No | -- | -- | Surface casing produced no fluid. Well shut in for 15min ended with a whisper. Tubing shut in. |
401877820 | Form 17 | 12/13/2018 | 12/17/2018 | | 75 | GAS | -- | 1 | WHISPER | 1 | 1 | No | -- | -- | SURFACE CASING PRODUCED NO FLUIDS. EXTRA 30 MIN ENDED WITH WHISPER. SHUT IN 15 MIN ENDED WITH WHISPER. |
401635422 | Form 17 | 4/19/2018 | 5/9/2018 | PLUNGER LIFT | 27 | GAS | -- | 0 | DOWN TO 0 | 0 | 0 | No | -- | -- | Surface casing produced no fluids. Surface casing and production casing were both on a vacuum. Surface casing shut in for 15 minutes ended with a whisper. |
401616908 | Form 17 | 4/19/2018 | 4/23/2018 | PLUNGER LIFT | 27 | GAS | -- | 0 | DOWN TO 0 | 0 | 0 | No | -- | -- | Surface casing produced no fluids. Surface casing and production casing were both on a vacuum. Surface casing shut in for 15 minutes ended with a whisper. |