Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-45497YELLOWHAMMER
30N2-8HZ
KERR MCGEE OIL & GAS ONSHORE LP
47120
PR
5/26/2021
DJ HORIZONTAL NIOBRARA
16950
WELD  123
NWSW 8 1N68W 6
452217
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1862 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
403766127Form 174/18/20244/23/2024 53CONTINUOUS GAS0 NO FLOW 316334YesYesNoSurface Casing produced no liquid.
403341764Form 173/7/20233/9/2023 93CONTINUOUS GAS1 WHISPER 309314YesYesNo Surface Casing produced no liquid.
402996334Form 173/24/20223/28/2022 106CONTINUOUS GAS1 WHISPER 550541YesYesNoSurface Casing produced no liquid.
402720571Form 176/15/20216/16/2021 139CONTINUOUS GAS1 WHISPER 20342034No----Tubing shut in. Surface Casing produced no liquid.
402527240Form 1711/6/202011/6/2020 97CONTINUOUS GAS0 NO FLOW 00No----Casing dead. Surface Casing produced no liquid.
402399633Form 175/11/20205/15/2020 155GAS --0 DOWN TO 0 00No----No Tubing Installed. Casing produced no pressure. Surface Casing produced no liquid.
402241904Form 1711/13/201911/18/2019PLUNGER LIFT308GAS --1 WHISPER 00No----SURFACE CASING PRODUCED NO FLUIDS. TUBING AND CASING SHUT IN.
402053498Form 175/14/20195/23/2019PLUNGER LIFT8GAS --0 DOWN TO 0 ----No----Surface casing produced no fluid. Well shut in for 15min ended with a whisper. Tubing shut in.
401676764Form 176/12/20186/18/2018 347GAS --1 WHISPER 11No----Surface casing produced no fluids. Blew down surface casing an extra 30 min ended with a whisper of gas. Surface casing shut in for 15 min ended with a whisper of gas. Master valve was shut. Drilled and uncompleted form 17.
401571891Form 172/27/20183/13/2018 402GAS --1 WHISPER 00No----Surface casing produced no fluids. Blew down surface casing an extra 30 min ended with a whisper. Surface casing shut in for 15 min ended with 44 PSI. Post drill form 17.