| 404226349 | Form 17 | 5/13/2025 | 6/2/2025 | PLUNGER LIFT | 113 | CONTINUOUS | WATER AND GAS | 0 | CONTINUOUS | 346 | 336 | No | -- | -- | Remediation follow up test. 113 PSI continuous gas and water flow blew down to 0 PSI within thirty minutes, gas and water present for entire test. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403805688 | Form 17 | 5/22/2024 | 5/28/2024 | | 53 | CONTINUOUS | GAS AND LIQUID HYDROCARBON | 0 | CONTINUOUS | 463 | 463 | No | -- | -- | Annual test. 53 PSI liquid and gas flow blew down to 0 PSI in seconds. Initial continuous flow of liquid and gas, whisper of gas and surges of trickling liquid at random for entire test. PDC will monitor pressure and re-test according to bradenhead policy.
|
| Click for Specifics | Full | 6/5/2023 | 6/12/2023 | | 8 | Down to Zero | -- | 0 | No Flow | 271 | 269 | No | No | No | Annual Test. 8 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403079721 | Form 17 | 6/13/2022 | 6/15/2022 | FLOWING | 88 | DOWN TO 0 | GAS | 0 | NO FLOW | 286 | 287 | No | -- | -- | Test after pressure discovery. Gaseous on open for 5 seconds and died. Unable to sample due to lack of volume. No flow for remainder of test. |
| 402857446 | Form 17 | 10/27/2021 | 10/29/2021 | PLUNGER LIFT | 2 | WHISPER | GAS | 0 | NO FLOW | 338 | 337 | No | -- | -- | Re-test after displacement and 24 day build up.
Whisper on open for 35 seconds and died. No flow for remainder of test. |
| 402838153 | Form 17 | 9/30/2021 | 10/12/2021 | FLOWING | 210 | CONTINUOUS | WATER H20 | 0 | CONTINUOUS | 350 | 345 | Yes | No | Yes | Test per NTO after pressure. Water at open. Water continuous for entire test. Made 2.5 gallons total. |
| 402808093 | Form 17 | 9/2/2021 | 9/11/2021 | PLUNGER LIFT | 23 | WHISPER | GAS | 0 | NO FLOW | 355 | 357 | No | -- | -- | Test per NTO. Whisper on open for 5 seconds and died. No flow for remainder of test. |
| 402546712 | Form 17 | 11/25/2020 | 12/4/2020 | PLUNGER LIFT | 9 | WHISPER | GAS | 0 | NO FLOW | 558 | 562 | No | -- | -- | Test per 2020 NTO. Whisper on open for 20 seconds and died. No flow for the remainder of the test. |
| 402260814 | Form 17 | 12/4/2019 | 12/11/2019 | FLOWING | 1 | DOWN TO 0 | -- | 0 | NO FLOW | 1372 | 1422 | No | -- | -- | Test after DOFP. Blew dead in less than 5 seconds. BH dead. |
| 402071521 | Form 17 | 6/2/2019 | 6/11/2019 | SHUT-IN | 0 | NO FLOW | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Test prior to toe-prep/frac. |