403963739 | Form 17 | 10/18/2024 | 10/21/2024 | PLUNGER LIFT | 0 | NO FLOW | -- | 0 | NO FLOW | 394 | 410 | No | -- | -- | Remediation follow up test. 0 PSI, no pressure or flow observed. PDC will monitor pressure and re-test according to bradenhead policy. |
403737361 | Form 17 | 3/29/2024 | 4/1/2024 | SHUT-IN | 2 | DOWN TO 0 | GAS | 0 | NO FLOW | 697 | 697 | No | -- | -- | Remediation Follow-Up test. 2 PSI gas flow blew down to 0 PSI in seconds with no flow or pressure for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
403491266 | Form 17 | 8/7/2023 | 8/9/2023 | PLUNGER LIFT | 68 | CONTINUOUS | GAS | 0 | NO FLOW | 675 | 669 | No | -- | -- | post Production Follow up test. 68 PSI blew slight gas for 30 seconds then blew down to 0 PSI, no pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. PDC will continue to monitor monthly. |
Click for Specifics | Full | 5/4/2023 | 5/15/2023 | | 38 | Down to Zero | -- | 0 | Down to Zero | 715 | 713 | No | None | None | Annual Test. 38 PSI blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
403051813 | Form 17 | 5/11/2022 | 5/17/2022 | FLOWING | 0 | NO FLOW | -- | 0 | NO FLOW | 1294 | 1291 | No | -- | -- | Test after DOFP. BH dead. |
402908433 | Form 17 | 12/21/2021 | 12/23/2021 | SHUT-IN | 0 | NO FLOW | NONE | 0 | NO FLOW | 0 | 0 | No | -- | -- | Test prior to toe prep/frac. Vacuum on open for 1 minute and 42 seconds. |