Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-45251ROBIN
9-13HZ
KERR MCGEE OIL & GAS ONSHORE LP
47120
PR
2/20/2019
WATTENBERG
90750
WELD  123
SESE 9 1N65W 6
441273
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1897 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
403756240Form 174/11/20244/16/2024 24CONTINUOUS GAS0 NO FLOW 438434YesYesNo Surface Casing produced no liquid.
403341675Form 173/7/20233/9/2023 17CONTINUOUS GAS1 WHISPER 377380No----Surface Casing produced no liquid.
403190628Form 1710/6/202210/7/2022 85CONTINUOUS GAS1 WHISPER 370345YesYesNoSurface Casing produced no liquid.
403139906Form 178/17/20228/18/2022 0NO FLOW NONE0 NO FLOW 357370No---- Surface Casing produced no liquid.
402788656Form 178/16/20218/23/2021 18CONTINUOUS GAS1 WHISPER 366369YesYesNo Surface Casing produced no liquid.
402480622Form 179/2/20209/16/2020 13CONTINUOUS --0 NO FLOW 534512No----Surface Casing produced no liquid.
402000026Form 173/4/20194/8/2019PLUNGER LIFT126GAS --1 GAS 18111813No----Surface casing produced no fluids. Well shut in for 15 minutes ended with 55 PSI. Blew down surface casing an extra 30 minutes ended with a whisper.
401769211Form 179/13/20189/20/2018 398GAS --1 WHISPER 00No----Surface casing produced no fluids. Blew down surface casing an extra 30 min ended with a whisper. Surface casing shut in for 15 min ended with 14 PSI.
401645633Form 175/9/20185/18/2018PLUNGER LIFT3081GAS --1 WHISPER 11No----Surface casing produced 1 gallon of condensate. Blew down surface casing an extra 30 minutes ended with a whisper. Surface casing shut in for 15 minutes ended with 17 PSI. Well and master shut in.
401517589Form 171/11/20181/17/2018 348GAS --1 WHISPER 11No----Surface casing produced no fluids. Surface casing blown down for extra 30 minutes ended with a whisper. Surface casing shut in for 15 minutes ended with 20 PSI. Master valve was shut. Post drill Form 17