| 404292508 | Form 17 | 7/10/2025 | 7/24/2025 | PLUNGER LIFT | 126 | DOWN TO 0 | GAS | 45 | WHISPER | 607 | 627 | No | -- | -- | Remediation follow up test. 126 PSI gas flow blew down to 45 PSI within thirty minutes, gas observed throughout entire test. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403867974 | Form 17 | 7/23/2024 | 7/26/2024 | PLUNGER LIFT | 79 | DOWN TO 0 | GAS | 0 | NO FLOW | 385 | 387 | No | -- | -- | Annual Test. 79 PSI gas flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| Click for Specifics | Full | 9/20/2023 | 9/25/2023 | Plunger Lift | 0 | Down to Zero | -- | 0 | Down to Zero | 478 | 474 | No | No | No | Annual Test. 0 PSI, with no pressure or flow observed for the entire 30-minute test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403084641 | Form 17 | 6/20/2022 | 6/21/2022 | PLUNGER LIFT | 112 | DOWN TO 0 | GAS | 0 | NO FLOW | 437 | 437 | Yes | -- | -- | Annual Test, 112 PSI gas flow blew down to 0 PSI within first minute of test. No pressure or flow observed for the remainder of the test. PDC collected a sample 6/8/2022 and will submit results via form 43 as soon as possible. PDC will continue to monitor monthly. |
| 402939943 | Form 17 | 1/27/2022 | 1/28/2022 | SHUT-IN | 100 | CONTINUOUS | WATER H20 | 0 | NO FLOW | 731 | 731 | Yes | -- | -- | Ad Hoc Engineering test, 100 PSI slight water blew down to 0 PSI within first 5 minutes of test. No pressure or flow observed for the remainder of the test. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. PDC will continue to monitor monthly. |
| 402719995 | Form 17 | 5/6/2021 | 6/16/2021 | PLUNGER LIFT | 6 | DOWN TO 0 | WATER AND VAPOR | 0 | | 575 | 575 | No | -- | -- | Abatement system follow up test, 6 PSI whisper blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. |
| 402541678 | Form 17 | 11/13/2020 | 11/30/2020 | | 74 | WHISPER | GAS | 0 | NO FLOW | 646 | 643 | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
| 402456109 | Form 17 | 3/12/2020 | 7/29/2020 | FLOWING | 159 | GAS | -- | 0 | NO FLOW | 758 | 758 | No | -- | -- | Abatement System Follow up test, 159 PSI blew down to 0 PSI within first minute of test. no pressure or flow observed for remainder of test. PDC will attempt to collect a sample and submit results. PDC will follow up with a sundry and re-test in 6 months. |
| 402034416 | Form 17 | 4/26/2019 | 5/7/2019 | FLOWING | 143 | DOWN TO 0 | -- | 0 | NO FLOW | 1760 | 1760 | No | -- | -- | 143 PSI blew down to 0 PSI instantly, no flow or pressure for the remainder of bradenhead test. PDC will follow up with a sundry proposing a remediation plan for bradenhead pressure. |
| 401760501 | Form 17 | 7/29/2018 | 9/12/2018 | SHUT-IN | 105 | DOWN TO 0 | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Post TD test, 105 PSI blew down to 0 PSI within seconds of test, no flow or pressure for remainder of test. |