| 404292979 | Form 17 | 7/14/2025 | 7/24/2025 | PLUNGER LIFT | 110 | CONTINUOUS | WATER H20 | 0 | CONTINUOUS | 458 | 463 | No | -- | -- | Remediation follow up test. 110 PSI water flow blew down to 0 in thirty minutes, water observed for entire test, ~6 gals. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403867514 | Form 17 | 7/23/2024 | 7/26/2024 | PLUNGER LIFT | 201 | DOWN TO 0 | WATER AND GAS | 0 | NO FLOW | 371 | 368 | No | -- | -- | Annual test. 201 PSI water and gas flow blew down to 0 PSI in seconds, water present until 25 minute mark. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403539690 | Form 17 | 9/20/2023 | 9/25/2023 | PLUNGER LIFT | 38 | CONTINUOUS | WATER AND GAS | 0 | NO FLOW | 411 | 414 | No | -- | -- | Annual Test. 38 PSI water and gas flow blew down to 0 PSI within first minute of test. Water trickled for 12 minutes, no flow or pressure for the remainder of test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403084614 | Form 17 | 6/20/2022 | 6/21/2022 | PLUNGER LIFT | 56 | CONTINUOUS | WATER AND GAS | 0 | NO FLOW | 384 | 384 | Yes | -- | -- | Annual Test, 56 PSI water and gas flow blew down to 0 PSI within first minute of test. No pressure observed for the remainder of the test, water present for the duration of the test. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. PDC will continue to monitor monthly. |
| 402720017 | Form 17 | 4/25/2021 | 6/16/2021 | FLOWING | 3 | DOWN TO 0 | WATER H20 | 1 | | 562 | 562 | No | -- | -- | Abatement system follow up test, 3 PSI blew down to 1 PSI within thirty minutes. PDC will submit sundry with bradenhead details as soon as possible. |
| 402694153 | Form 17 | 11/13/2020 | 5/19/2021 | FLOWING | 55 | CONTINUOUS | GAS | 0 | NO FLOW | 641 | 641 | No | -- | -- | Abatement system follow up test, 55 PSI slight gas blew down to 0 PSI within first min of test. No pressure or flow observed for the remainder of the test |
| 402423960 | Form 17 | 3/12/2020 | 6/16/2020 | | 27 | CONTINUOUS | -- | 0 | NO FLOW | 840 | 842 | No | -- | -- | 6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC. |
| 402034676 | Form 17 | 4/22/2019 | 5/7/2019 | FLOWING | 368 | CONTINUOUS | -- | 0 | NO FLOW | 2440 | 2440 | Yes | -- | -- | 368 PSI blew down to 0 PSI, PDC has collected a bradenhead and production sample and will submit via form 43 when available. PDC will follow up with a sundry proposing a remediation plan for bradenhead pressure |
| 401760574 | Form 17 | 7/29/2018 | 9/12/2018 | SHUT-IN | 30 | DOWN TO 0 | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Post TD test, 30 PSI blew down within seconds no flow or pressure for duration of test |