Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-44862Geib
26V-334
PDC ENERGY INC
69175
PR
10/1/2024
WATTENBERG
90750
WELD  123
NENE 26 5N65W 6
450654
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1632 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404292979Form 177/14/20257/24/2025PLUNGER LIFT110CONTINUOUS WATER H200 CONTINUOUS 458463No----Remediation follow up test. 110 PSI water flow blew down to 0 in thirty minutes, water observed for entire test, ~6 gals. Operator will monitor pressure and re-test according to bradenhead policy.
403867514Form 177/23/20247/26/2024PLUNGER LIFT201DOWN TO 0 WATER AND GAS0 NO FLOW 371368No----Annual test. 201 PSI water and gas flow blew down to 0 PSI in seconds, water present until 25 minute mark. PDC will monitor pressure and re-test according to bradenhead policy.
403539690Form 179/20/20239/25/2023PLUNGER LIFT38CONTINUOUS WATER AND GAS0 NO FLOW 411414No----Annual Test. 38 PSI water and gas flow blew down to 0 PSI within first minute of test. Water trickled for 12 minutes, no flow or pressure for the remainder of test. PDC will monitor pressure and re-test according to bradenhead policy.
403084614Form 176/20/20226/21/2022PLUNGER LIFT56CONTINUOUS WATER AND GAS0 NO FLOW 384384Yes----Annual Test, 56 PSI water and gas flow blew down to 0 PSI within first minute of test. No pressure observed for the remainder of the test, water present for the duration of the test. PDC will schedule a sampling event and submit results via form 43 as well as a remediation plan via sundry as soon as possible. PDC will continue to monitor monthly.
402720017Form 174/25/20216/16/2021FLOWING3DOWN TO 0 WATER H201  562562No----Abatement system follow up test, 3 PSI blew down to 1 PSI within thirty minutes. PDC will submit sundry with bradenhead details as soon as possible.
402694153Form 1711/13/20205/19/2021FLOWING55CONTINUOUS GAS0 NO FLOW 641641No----Abatement system follow up test, 55 PSI slight gas blew down to 0 PSI within first min of test. No pressure or flow observed for the remainder of the test
402423960Form 173/12/20206/16/2020 27CONTINUOUS --0 NO FLOW 840842No----6 month follow-up test post abatement system install. PDC will continue to monitor pressure and report any increase in pressure to COGCC.
402034676Form 174/22/20195/7/2019FLOWING368CONTINUOUS --0 NO FLOW 24402440Yes----368 PSI blew down to 0 PSI, PDC has collected a bradenhead and production sample and will submit via form 43 when available. PDC will follow up with a sundry proposing a remediation plan for bradenhead pressure
401760574Form 177/29/20189/12/2018SHUT-IN30DOWN TO 0 --0 NO FLOW 00No----Post TD test, 30 PSI blew down within seconds no flow or pressure for duration of test