Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-44861Geib
26V-234
PDC ENERGY INC
69175
PR
2/20/2019
WATTENBERG
90750
WELD  123
NENE 26 5N65W 6
450654
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1632 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404304742Form 177/15/20258/4/2025PLUNGER LIFT118DOWN TO 0 WATER AND GAS0 CONTINUOUS 464458No----Remediation follow up test. 118 PSI gas and water, blew down to 0 within first few seconds, water continued for entire test. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy.
403867997Form 177/23/20247/26/2024PLUNGER LIFT55DOWN TO 0 WATER AND GAS0 NO FLOW 363363No----Annual Test. 55 PSI water and gas flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy.
403539685Form 179/20/20239/25/2023PLUNGER LIFT45CONTINUOUS WATER AND GAS0 NO FLOW 425424No----Annual Test. 45 PSI water and gas flow blew down to 0 PSI within first minute of test. Water trickled for 11 minutes, no flow or pressure for remainder of test. PDC will monitor pressure and re-test according to bradenhead policy.
403084629Form 176/20/20226/21/2022PLUNGER LIFT54CONTINUOUS WATER AND GAS0 CONTINUOUS 384384Yes----Annual Test, 54 PSI water and gas flow blew down to 0 PSI within first minute of test. No pressure observed for the remainder of the test, water present for the duration of the test. PDC collected a sample 6/8/2022 and will submit results via form 43 as soon as possible. PDC will continue to monitor monthly.
Click for SpecificsFull7/20/202111/1/2021 0No Flow--0No Flow506511NoNoneNone 
402456079Form 173/12/20207/29/2020FLOWING107GAS --0 NO FLOW 825825No----Abatement System Follow up test, 107 PSI blew down to 0 PSI within first minute of test. no pressure or flow observed for remainder of test. PDC will attempt to collect a sample and submit results. PDC will follow up with a sundry and re-test in 6 months.
402034749Form 174/25/20195/7/2019FLOWING126DOWN TO 0 --0 NO FLOW 22992299No---- PSI blew down to 0 PSI instantly, no flow or pressure for the remainder of bradenhead test. PDC will follow up with a sundry proposing a remediation plan for bradenhead pressure.
401760555Form 177/29/20189/12/2018SHUT-IN150DOWN TO 0 --0 NO FLOW 00No----Post TD test, 150 PSi blew down to 0 PSI within seconds no flow or pressure for remainder of test