| 404304742 | Form 17 | 7/15/2025 | 8/4/2025 | PLUNGER LIFT | 118 | DOWN TO 0 | WATER AND GAS | 0 | CONTINUOUS | 464 | 458 | No | -- | -- | Remediation follow up test. 118 PSI gas and water, blew down to 0 within first few seconds, water continued for entire test. Operator will schedule a sampling event and submit results via form 43. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403867997 | Form 17 | 7/23/2024 | 7/26/2024 | PLUNGER LIFT | 55 | DOWN TO 0 | WATER AND GAS | 0 | NO FLOW | 363 | 363 | No | -- | -- | Annual Test. 55 PSI water and gas flow blew down to 0 PSI within first few seconds of test. No pressure or flow observed for the remainder of the test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403539685 | Form 17 | 9/20/2023 | 9/25/2023 | PLUNGER LIFT | 45 | CONTINUOUS | WATER AND GAS | 0 | NO FLOW | 425 | 424 | No | -- | -- | Annual Test. 45 PSI water and gas flow blew down to 0 PSI within first minute of test. Water trickled for 11 minutes, no flow or pressure for remainder of test. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403084629 | Form 17 | 6/20/2022 | 6/21/2022 | PLUNGER LIFT | 54 | CONTINUOUS | WATER AND GAS | 0 | CONTINUOUS | 384 | 384 | Yes | -- | -- | Annual Test, 54 PSI water and gas flow blew down to 0 PSI within first minute of test. No pressure observed for the remainder of the test, water present for the duration of the test. PDC collected a sample 6/8/2022 and will submit results via form 43 as soon as possible. PDC will continue to monitor monthly. |
| Click for Specifics | Full | 7/20/2021 | 11/1/2021 | | 0 | No Flow | -- | 0 | No Flow | 506 | 511 | No | None | None | |
| 402456079 | Form 17 | 3/12/2020 | 7/29/2020 | FLOWING | 107 | GAS | -- | 0 | NO FLOW | 825 | 825 | No | -- | -- | Abatement System Follow up test, 107 PSI blew down to 0 PSI within first minute of test. no pressure or flow observed for remainder of test. PDC will attempt to collect a sample and submit results. PDC will follow up with a sundry and re-test in 6 months. |
| 402034749 | Form 17 | 4/25/2019 | 5/7/2019 | FLOWING | 126 | DOWN TO 0 | -- | 0 | NO FLOW | 2299 | 2299 | No | -- | -- | PSI blew down to 0 PSI instantly, no flow or pressure for the remainder of bradenhead test. PDC will follow up with a sundry proposing a remediation plan for bradenhead pressure. |
| 401760555 | Form 17 | 7/29/2018 | 9/12/2018 | SHUT-IN | 150 | DOWN TO 0 | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Post TD test, 150 PSi blew down to 0 PSI within seconds no flow or pressure for remainder of test |