| 404292913 | Form 17 | 7/14/2025 | 7/24/2025 | PLUNGER LIFT | 127 | CONTINUOUS | GAS | 6 | WHISPER | 534 | 534 | No | -- | -- | Remediation follow up test. 127 PSI gas blew down to 6 in thirty minutes, whisper gas continued for entire test. Operator will monitor pressure and re-test according to bradenhead policy. |
| 403867108 | Form 17 | 7/23/2024 | 7/26/2024 | PLUNGER LIFT | 167 | CONTINUOUS | WATER AND GAS | 138 | CONTINUOUS | 439 | 427 | No | -- | -- | Annual test. 167 PSI continuous flow blew down to 138 PSI in 30 minutes. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403536898 | Form 17 | 9/20/2023 | 9/21/2023 | SHUT-IN | 63 | CONTINUOUS | GAS | 0 | CONTINUOUS | 564 | 564 | No | -- | -- | Annual test. 63 PSI gas flow blew down to 0 PSI in 30 minutes. Surging fluid started at 2.5 minute mark and lasted for entire test, ~12 gallons total fluid. PDC will monitor pressure and re-test according to bradenhead policy. |
| 403084609 | Form 17 | 6/20/2022 | 6/21/2022 | PLUNGER LIFT | 146 | CONTINUOUS | WATER AND GAS | 15 | CONTINUOUS | 405 | 406 | Yes | -- | -- | Annual Test, 146 PSI continuous water and gas flow blew down to 15 PSI in 30 minutes. PDC collected a sample 6/8/2022 and will submit results via form 43 as soon as possible. PDC will continue to monitor monthly. |
| 402720015 | Form 17 | 5/6/2021 | 6/16/2021 | PLUNGER LIFT | 2 | WHISPER | WATER AND VAPOR | 0 | NO FLOW | 546 | 546 | No | -- | -- | Abatement system follow up test, 2 PSI slight water and vapor flow blew down to 0 PSI within first twenty minutes of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible. |
| 402545049 | Form 17 | 11/13/2020 | 12/2/2020 | FLOWING | 141 | CONTINUOUS | GAS | 22 | WHISPER | 604 | 604 | No | -- | -- | Abatement System Follow up Test, 141 PSI continous gas blew down to whisper 22 PSI at the end of the 30 min test. |
| 402456100 | Form 17 | 3/12/2020 | 7/29/2020 | FLOWING | 98 | GAS | -- | 0 | NO FLOW | 756 | 756 | No | -- | -- | Abatement System Follow up test, 98 PSI blew down to 0 PSI within first minute of test. no pressure or flow observed for remainder of test. PDC will attempt to collect a sample and submit results. PDC will follow up with a sundry and re-test in 6 months. |
| 402035815 | Form 17 | 4/26/2019 | 5/8/2019 | FLOWING | 114 | CONTINUOUS | -- | 1 | WHISPER | 1961 | 1959 | No | -- | -- | 114 PSI blew down to 1 PSI instantly slight whisper throughout the test, PDC will collect a bradenhead and production sample and will submit via form 43 when available. PDC will follow up with a sundry proposing a remediation plan for bradenhead pressure. |
| 402034919 | Form 17 | 4/26/2019 | 5/7/2019 | FLOWING | 114 | CONTINUOUS | -- | 1 | WHISPER | 1961 | 1959 | Yes | -- | -- | 114 PSI blew down to 1 PSI instantly slight whisper throughout the test, PDC has collected a bradenhead and production sample and will submit via form 43 when available. PDC will follow up with a sundry proposing a remediation plan for bradenhead pressure |
| 401760522 | Form 17 | 7/29/2018 | 9/12/2018 | SHUT-IN | 295 | DOWN TO 0 | -- | 0 | NO FLOW | 0 | 0 | No | -- | -- | Post TD test 295 PSI blew down to 0 PSI within first mminute of test, no flow or pressure for duration of test |