Skip to Main Content

Incident Search

 
BradenheadView Related Related View DocsDoc
 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation ID
WELL05-123-44860Geib
26V-314
PDC ENERGY INC
69175
PR
3/1/2024
WATTENBERG
90750
WELD  123
NENE 26 5N65W 6
450654
   
Search for Different Bradenhead:
County Code: Sequence Code:
 
Surface Casing Depth: 1629 ft.
View Form/DetailsReport TypeTest DateSubmit DateWell StatusInitial Surf CasingBradenhead Flow (Start)Fluid TypeEnd Surf CasingBradenhead Flow (End)Initial Prod CasingEnd Prod CasingSample Taken?GasLiquidComments
404292913Form 177/14/20257/24/2025PLUNGER LIFT127CONTINUOUS GAS6 WHISPER 534534No----Remediation follow up test. 127 PSI gas blew down to 6 in thirty minutes, whisper gas continued for entire test. Operator will monitor pressure and re-test according to bradenhead policy.
403867108Form 177/23/20247/26/2024PLUNGER LIFT167CONTINUOUS WATER AND GAS138 CONTINUOUS 439427No----Annual test. 167 PSI continuous flow blew down to 138 PSI in 30 minutes. PDC will monitor pressure and re-test according to bradenhead policy.
403536898Form 179/20/20239/21/2023SHUT-IN63CONTINUOUS GAS0 CONTINUOUS 564564No----Annual test. 63 PSI gas flow blew down to 0 PSI in 30 minutes. Surging fluid started at 2.5 minute mark and lasted for entire test, ~12 gallons total fluid. PDC will monitor pressure and re-test according to bradenhead policy.
403084609Form 176/20/20226/21/2022PLUNGER LIFT146CONTINUOUS WATER AND GAS15 CONTINUOUS 405406Yes----Annual Test, 146 PSI continuous water and gas flow blew down to 15 PSI in 30 minutes. PDC collected a sample 6/8/2022 and will submit results via form 43 as soon as possible. PDC will continue to monitor monthly.
402720015Form 175/6/20216/16/2021PLUNGER LIFT2WHISPER WATER AND VAPOR0 NO FLOW 546546No----Abatement system follow up test, 2 PSI slight water and vapor flow blew down to 0 PSI within first twenty minutes of test. No pressure or flow observed for the remainder of the test. PDC will submit sundry with bradenhead details as soon as possible.
402545049Form 1711/13/202012/2/2020FLOWING141CONTINUOUS GAS22 WHISPER 604604No----Abatement System Follow up Test, 141 PSI continous gas blew down to whisper 22 PSI at the end of the 30 min test.
402456100Form 173/12/20207/29/2020FLOWING98GAS --0 NO FLOW 756756No----Abatement System Follow up test, 98 PSI blew down to 0 PSI within first minute of test. no pressure or flow observed for remainder of test. PDC will attempt to collect a sample and submit results. PDC will follow up with a sundry and re-test in 6 months.
402035815Form 174/26/20195/8/2019FLOWING114CONTINUOUS --1 WHISPER 19611959No----114 PSI blew down to 1 PSI instantly slight whisper throughout the test, PDC will collect a bradenhead and production sample and will submit via form 43 when available. PDC will follow up with a sundry proposing a remediation plan for bradenhead pressure.
402034919Form 174/26/20195/7/2019FLOWING114CONTINUOUS --1 WHISPER 19611959Yes----114 PSI blew down to 1 PSI instantly slight whisper throughout the test, PDC has collected a bradenhead and production sample and will submit via form 43 when available. PDC will follow up with a sundry proposing a remediation plan for bradenhead pressure
401760522Form 177/29/20189/12/2018SHUT-IN295DOWN TO 0 --0 NO FLOW 00No----Post TD test 295 PSI blew down to 0 PSI within first mminute of test, no flow or pressure for duration of test